Home Projects More like: Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading [Clear] # Title Funder Funding Start End Status 41 Development of novel met-ocean analytical techniques to characterise turbulence. EPSRC £0 Aug. 31, 2019 Aug. 31, 2023 Closed 42 Impacts of Atmospheric Turbulence on Wind Turbine Main-Bearing Function and Failures EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 43 Unsteady Fluid Dynamics of Tidal Stream Turbines EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 44 Numerical Prototype of the EDF Blyth Floating Wind Farm EPSRC £0 Aug. 31, 2021 Aug. 31, 2025 Active 45 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC £1,802,754 Feb. 1, 2012 July 30, 2015 Closed 46 X-MED: EXtreme Loading of Marine Energy Devices due to Waves, Current, Flotsam and Mammal Impact EPSRC £4,506,885 Feb. 1, 2012 July 31, 2015 Closed 47 Integration of wave and offshore wind energies EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 48 Supergen Wind Hub EPSRC £5,934,376 June 18, 2014 Sept. 17, 2019 Closed 49 Supergen Wind Hub EPSRC £14,835,940 June 18, 2014 Sept. 18, 2019 Closed 50 Step-WEC: STEP CHANGE FOR WAVE ENERGY CONVERSION THROUGH FLOATING MULTI-BODY MULTI-MODE SYSTEMS IN SWELL EPSRC £1,276,380 June 27, 2013 Sept. 29, 2016 Closed 51 Step-WEC: STEP CHANGE FOR WAVE ENERGY CONVERSION THROUGH FLOATING MULTI-BODY MULTI-MODE SYSTEMS IN SWELL EPSRC £3,190,950 June 27, 2013 Sept. 30, 2016 Closed 52 Structural Composites Research Facility (SCRF) EPSRC £2,799,560 May 31, 2017 Nov. 30, 2020 Closed 53 Structural Composites Research Facility (SCRF) EPSRC £6,998,900 May 31, 2017 Nov. 30, 2020 Closed 54 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 55 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 56 Structural Analysis and Optimisation of a Wave Energy Converter EPSRC £0 Aug. 31, 2019 Sept. 14, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »