Home Projects More like: Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading [Clear] # Title Funder Funding Start End Status 1 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 2 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 3 Development of a Practical Soil Constitutive Model Suitable for the Design of Offshore Wind Turbine Foundations in Sand Considering Cyclic Loading EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 4 Advanced Numerical Modelling of Offshore Wind Turbine (OWT) Foundations in Sand EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 5 Development of a Practical Soil Constitutive Model Suita-ble for the Design of Offshore Wind Turbine Foundations in Sand, Considering Cyclic Loading - EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 6 Cyclic Behaviour of Monopile Foundations for Offshore Wind Farms EPSRC £650,180 June 30, 2010 March 30, 2014 Closed 7 Cyclic Behaviour of Monopile Foundations for Offshore Wind Farms EPSRC £1,625,450 June 30, 2010 March 31, 2014 Closed 8 Seismic response of monopiles in liquefiable soils EPSRC £0 Jan. 1, 2021 Jan. 1, 2025 Active 9 Process-based soil behaviour modelling for subsea structure foundations in carbonate sand environment EPSRC £457,520 July 11, 2021 July 10, 2023 Active 10 Process-based soil behaviour modelling for subsea structure foundations in carbonate sand environment EPSRC £1,143,800 July 11, 2021 July 11, 2024 Active 11 Design of Foundations and Anchors in Rock for Offshore Wind Energy Systems EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 12 Design of Foundations and Anchors in Rock for Offshore Wind Energy Systems EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 13 Long term numerical simulation of offshore wind turbine monopile foundations EPSRC £0 Sept. 30, 2018 Dec. 30, 2022 Active 14 ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing EPSRC £2,242,616 Sept. 30, 2017 March 30, 2020 Closed 15 ALPACA: Axial-Lateral Pile Analysis for Chalk Applying multi-scale field and laboratory testing EPSRC £5,606,540 Sept. 30, 2017 March 31, 2020 Closed 16 Offshore Wind Turbine Foundation EPSRC £0 Sept. 30, 2016 Sept. 29, 2020 Closed 17 Offshore Wind Turbine Foundation EPSRC £0 Sept. 30, 2016 Sept. 30, 2020 Closed 18 Fatigue and damage tolerance of 3D-woven composites EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 19 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £1,589,160 Sept. 30, 2021 Sept. 29, 2024 Active 20 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £3,972,900 Sept. 30, 2021 Sept. 30, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »