# Title Funder Funding Start End Status
41 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£202,124
May 31, 2018 June 29, 2020 Closed
42 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£505,310
May 31, 2018 June 30, 2020 Closed
43 Developing and validating a holistic O&M optimisation tool for offshore renewable energy projects EPSRC
£0
Aug. 31, 2019 Oct. 31, 2023 Active
44 Developing Offshore Floating Technology EPSRC
£0
Aug. 31, 2022 Aug. 31, 2026 Active
45 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£2,580,280
June 30, 2021 June 29, 2026 Active
46 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC
£6,450,700
June 30, 2021 June 30, 2026 Active
47 Active wind farm control via morphing blade technology EPSRC
£0
Sept. 30, 2022 Sept. 30, 2025 Active
48 Modelling, Optimisation and Design of Conversion for Offshore Renewable Energy (UK-China MOD-CORE) EPSRC
£1,618,216
June 30, 2017 Jan. 2, 2021 Closed
49 Modelling, Optimisation and Design of Conversion for Offshore Renewable Energy (UK-China MOD-CORE) Newton Fund
£4,045,540
June 30, 2017 Jan. 2, 2021 Closed
50 Analysis of the transport vectors available for hydrogen and the technical, economic and regulatory factors which influence them EPSRC
£0
Aug. 31, 2020 Sept. 30, 2024 Active
51 Novel approach to Marine Energy device instrumenting and real-time sensor data processing EPSRC
£0
Aug. 31, 2019 Aug. 31, 2023 Closed
52 Optimising transmission infrastructure for accelerated offshore wind EPSRC
£0
Aug. 31, 2021 Aug. 31, 2025 Active
53 Centre for Advanced Materials for Renewable Energy Generation EPSRC
£4,074,878
Dec. 1, 2016 May 30, 2021 Closed
54 Centre for Advanced Materials for Renewable Energy Generation EPSRC
£10,187,195
Dec. 1, 2016 May 31, 2021 Closed
Reset