# Title Funder Funding Start End Status
1 MagMats: Magnesia-bearing construction materials for future energy infrastructure EPSRC
£1,016,326
March 30, 2015 Dec. 31, 2018 Closed
2 Engineered UK clays for production of low-carbon cements EPSRC
£165,356
June 30, 2022 June 29, 2026 Active
3 Engineered UK clays for production of low-carbon cements EPSRC
£997,934
June 30, 2022 June 29, 2026 Active
4 Engineered UK clays for production of low-carbon cements EPSRC
£857,130
June 30, 2022 June 29, 2026 Active
5 Multi-scale engineering of alkali-activated concretes for sustainable infrastructure EPSRC
£2,560,536
June 28, 2018 Jan. 26, 2024 Active
6 Predicting long-term performance of cement disposal systems for radionuclide-loaded zeolite and titanate ion exchangers EPSRC
£1,530,400
Nov. 1, 2016 March 31, 2019 Closed
7 High Value, low CO2 active binder concrete products Innovate UK
£542,004
June 30, 2009 Dec. 31, 2012 Closed
8 Performance Assessment and Development of Mineral-Based Cements at High Pressure and Temperature for Deep Borehole Disposal of HLW and SNF EPSRC
£849,408
Nov. 4, 2013 April 2, 2017 Closed
9 Performance Assessment and Development of Mineral-Based Cements at High Pressure and Temperature for Deep Borehole Disposal of HLW and SNF EPSRC
£2,123,520
Nov. 4, 2013 April 3, 2017 Closed
10 Nuclear Universities Consortium for Learning, Engagement And Research: NUCLEAR EPSRC
£77,673,270
April 30, 2011 Oct. 31, 2019 Closed
11 BBSRC Centre For Sustainable Bioenergy (BSBEC): Programme 4: Lignocellulosic Conversion To Bioethanol (LACE) BBSRC
£10,698,900
April 30, 2009 March 30, 2015 Closed
12 BBSRC Centre For Sustainable Bioenergy (BSBEC): Programme 4: Lignocellulosic Conversion To Bioethanol (LACE) BBSRC
£26,747,250
April 30, 2009 March 31, 2015 Closed
13 EPSRC Centre for Doctoral Training in Composites Science, Engineering and Manufacturing EPSRC
£12,807,510
Sept. 30, 2019 March 30, 2028 Active
14 Optimisation of large concrete DfMA structures for the Nuclear Industry EPSRC
£1,335,485
July 4, 2013 July 4, 2016 Closed
15 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC
£982,574
March 17, 2016 March 16, 2020 Closed
16 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC
£2,456,435
March 17, 2016 March 16, 2020 Closed
17 Silicon Compatible GaN Power Electronics EPSRC
£12,393,434
March 1, 2013 Aug. 30, 2018 Closed
18 Silicon Compatible GaN Power Electronics EPSRC
£30,983,585
March 1, 2013 Aug. 31, 2018 Closed
19 EPSRC Centre for Doctoral Training in Sustainable Chemistry EPSRC
£10,767,204
March 31, 2014 Sept. 29, 2023 Active
20 Integrating graphene into concrete and ceramic tiles for smart cities EPSRC, NERC
£0
Sept. 30, 2018 Dec. 30, 2022 Closed
Reset