Home Projects More like: TiPToP - TaIlored Pulse excitation for TailOred Plasma chemistries [Clear] # Title Funder Funding Start End Status 21 Dual Source Pulsed Plasmas for the Production of Ultra-High Performance Coatings EPSRC £540,268 May 13, 2007 Nov. 13, 2010 Closed 22 Targeted waveform enhanced plasma microreactor: Engineering Chemistry at the Interface of Microbubbles EPSRC £1,958,886 Dec. 2, 2019 Dec. 1, 2023 Active 23 Targeted waveform enhanced plasma microreactor: Engineering Chemistry at the Interface of Microbubbles EPSRC £4,897,215 Dec. 2, 2019 Dec. 1, 2023 Active 24 Dual Source Pulsed Plasmas for the Production of Ultra-High Performance Coatings EPSRC £83,980 May 26, 2007 Nov. 26, 2010 Closed 25 Extended Gyrokinetic Modelling for Dynamic Flows EPSRC £1,643,445 Sept. 30, 2016 Feb. 29, 2020 Closed 26 Coupling fluid and kinetic codes for laser-driven inertial fusion energy simulations EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 27 Smart Pulses for Subsurface Engineering EPSRC £4,976,886 Nov. 1, 2018 Oct. 31, 2023 Active 28 Smart Pulses for Subsurface Engineering EPSRC £12,442,215 Nov. 1, 2018 Oct. 31, 2024 Active 29 Plasma Physics HEC Consortium EPSRC £1,136,305 May 31, 2018 Dec. 31, 2022 Closed 30 Development of a novel atmospheric pressure plasma system for the reduction of water use in the cleaning of mirrors in Concentrating Solar Power plant EPSRC, NERC £0 Oct. 1, 2017 Feb. 18, 2023 Closed 31 SPATIO-TEMPORAL BEAM TAILORED FIBRE LASERS FOR ENERGY RESILIENT MANUFACTURING EPSRC £1,492,860 March 1, 2015 Aug. 31, 2016 Closed 32 3-D Effects on Tokamak Plasma Stability EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 33 ENERGY RESILIENT MANUFACTURING 2: SPATIO-TEMPORAL BEAM TAILORED FIBRE LASERS FOR ENERGY RESILIENT MANUFACTURING EPSRC £3,249,685 Sept. 30, 2016 Sept. 30, 2019 Closed 34 A low-cost computer cluster for the calculation of atomic data of importance in plasma physics EPSRC £161,005 March 1, 2010 Feb. 29, 2012 Closed 35 Bright IDEAS Award: Plasma-olyte EPSRC £503,126 March 1, 2010 Aug. 30, 2011 Closed 36 The Plasma-CCP Network EPSRC £629,975 June 30, 2015 July 30, 2021 Closed 37 Reactions of Stabilised Criegee Intermediates in the Atmosphere: Implications for Tropospheric Composition & Climate NERC £562,212 March 31, 2013 March 30, 2016 Closed 38 Reactions of Stabilised Criegee Intermediates in the Atmosphere: Implications for Tropospheric Composition & Climate NERC £79,804 March 25, 2013 Sept. 23, 2015 Closed 39 Atmospheric Chemistry In The Earth System (ACITES) Network NERC £326,998 March 1, 2013 Aug. 30, 2015 Closed 40 Atmospheric Chemistry In The Earth System (ACITES) Network NERC £336,798 Feb. 1, 2013 Jan. 31, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »