Home Projects More like: Energy efficient bio-based natural fibre insulation [Clear] # Title Funder Funding Start End Status 61 Nanomanufacturing of surfaces for smart, energy efficient buildings and transport vehicles EPSRC £0 Sept. 30, 2017 Dec. 30, 2021 Closed 62 Nanomanufacturing of surfaces for smart, energy efficient buildings and transport vehicles EPSRC £0 Sept. 30, 2017 Sept. 30, 2021 Closed 63 Insertion System development Innovate UK £177,796 Nov. 1, 2020 April 29, 2021 Closed 64 NanocompEIM Phase 2 - Nanocomposite Advanced Electrical Insulation Systems for Enhanced HVAC and HVDC Energy Networks EPSRC £751,414 Sept. 30, 2016 Dec. 31, 2019 Closed 65 NanocompEIM Phase 2 - Nanocomposite Advanced Electrical Insulation Systems for Enhanced HVAC and HVDC Energy Networks EPSRC £1,878,535 Sept. 30, 2016 Dec. 31, 2019 Closed 66 Tectoniks Limited: Development of Energy Efficient Portable Structures which Meet the Requirements of International Energy Conservation Codes. Innovate UK, NC3Rs £182,265 March 31, 2013 Dec. 31, 2013 Closed 67 Safer low-cost nuclear material storage through cold-spray formed boron carbide coated components (SAFESTORE) Innovate UK £189,000 Dec. 1, 2010 Feb. 29, 2012 Closed 68 Safer low-cost nuclear material storage through cold-spray formed boron carbide coated components (SAFESTORE) Innovate UK £472,500 Dec. 1, 2010 Feb. 29, 2012 Closed 69 SPECIFIC Tranche 2: Heat, Water, PV and Bio-inspiration EPSRC £8,134,890 May 31, 2013 May 31, 2016 Closed 70 Isothermal Refining by Organic Solvent Nanofiltration - ISOREF EPSRC £1,473,325 Feb. 1, 2015 Jan. 31, 2017 Closed 71 Intermolecular Charge Transport: A Novel Design Paradigm EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 72 Utilising In-Use Data to Reduce Costs, Decarbonise, Verify Build Quality and Ensure Healthy Buildings Innovate UK £107,880 March 31, 2023 June 30, 2023 Closed 73 Atomistic Computer Modelling of New Solar Cell Materials EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 74 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £679,558 April 30, 2009 Nov. 30, 2012 Closed 75 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £133,878 April 30, 2009 Nov. 30, 2012 Closed 76 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £439,862 Jan. 1, 2009 Oct. 31, 2012 Closed 77 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £1,698,895 April 30, 2009 Nov. 30, 2012 Closed 78 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £1,099,655 Jan. 1, 2009 Oct. 31, 2012 Closed 79 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £334,695 April 30, 2009 Nov. 30, 2012 Closed 80 Active-LIVing Envelopes (ALIVE) EPSRC £200,552 March 31, 2016 Nov. 30, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »