Home Projects More like: University of Bath and Ashridge Engineering Limited [Clear] # Title Funder Funding Start End Status 61 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £1,698,895 April 30, 2009 Nov. 30, 2012 Closed 62 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £1,099,655 Jan. 1, 2009 Oct. 31, 2012 Closed 63 Mitigation potential of horizontal Ground Coupled Heat Pumps for current and future climatic conditions: UK environmental modelling studies NERC £334,695 April 30, 2009 Nov. 30, 2012 Closed 64 Smart Meter Data Processing & Visualisation ISCF £350,005 May 31, 2017 Feb. 28, 2018 Closed 65 Low energy remote intelligent monitoring & control systems and products to better monitor and reduce energy consumption Innovate UK £956,620 July 31, 2009 July 31, 2012 Closed 66 ECHiPCHeP - Electronics Cooling via Hi Performance Coated Heat Pipes Innovate UK £561,600 March 31, 2015 March 31, 2016 Closed 67 Design of Resilient Concrete Infrastructure for Corrosive Biogenic Environments EPSRC £0 Sept. 21, 2017 March 30, 2021 Closed 68 Design of Resilient Concrete Infrastructure for Corrosive Biogenic Environments EPSRC £0 Sept. 30, 2017 March 31, 2021 Closed 69 Buysta project Innovate UK £25,000 April 30, 2014 Oct. 31, 2014 Closed 70 Project Plasma Innovate UK £125,032 March 1, 2017 Aug. 30, 2017 Closed 71 Project Plasma Innovate UK £312,580 March 1, 2017 Aug. 31, 2017 Closed 72 Control of biofouling in water pipes using guided waves EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 73 Novel high temperature steam transfer pipes EPSRC £399,708 Sept. 30, 2017 April 29, 2019 Closed 74 Get Better Off (home energy saving) Innovate UK £25,000 April 30, 2014 Oct. 31, 2014 Closed 75 Auxiliary Load Control Switch for Residential Demand Response Innovate UK £298,985 May 31, 2017 Oct. 31, 2017 Closed 76 Transferability of small-specimen data to large-scale component fracture assessment EPSRC £2,621,980 March 1, 2013 June 30, 2015 Closed 77 Increasing the Observability of Electrical Distribution Systems using Smart Meters (IOSM) EPSRC £199,464 Sept. 29, 2012 March 29, 2014 Closed 78 Increasing the Observability of Electrical Distribution Systems using Smart Meters (IOSM) EPSRC £498,660 Sept. 29, 2012 March 29, 2014 Closed 79 UNION (Ultrasonic Nuclear InspectiON) Innovate UK £3,934,675 March 31, 2015 March 31, 2018 Closed 80 Computational Modelling Structural Integrity for Nuclear Power Engineering EPSRC £0 Nov. 1, 2016 May 19, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »