Home Projects More like: TV White Space Testbed with Robust Spectrum Sensing Algorithms for M2M Communications [Clear] # Title Funder Funding Start End Status 41 EPSRC Engineering Fellowships for Growth: Narrow Band-gap Semiconductors for Integrated Sensing and Communications EPSRC £5,078,145 Aug. 30, 2014 Feb. 28, 2018 Closed 42 Productive Use of DC Solar Power in Africa to Improve the Quality of Rural Life EPSRC £309,564 June 30, 2019 Nov. 30, 2021 Closed 43 Productive Use of DC Solar Power in Africa to Improve the Quality of Rural Life EPSRC £773,910 June 30, 2019 Nov. 30, 2021 Closed 44 COnsumer-centric Privacy in smart Energy gridS EPSRC £685,768 Dec. 18, 2015 March 29, 2019 Closed 45 COnsumer-centric Privacy in smart Energy gridS EPSRC £1,714,420 Dec. 18, 2015 March 29, 2019 Closed 46 Graphene Flexible Electronics and Optoelectronics EPSRC £5,914,572 Feb. 1, 2013 Jan. 31, 2018 Closed 47 Applying Long-lived Metastable States with Switchable Functionality via Kinetic Control of Molecular Assembly - a Programme in Functional Materials EPSRC £6,481,738 Nov. 1, 2012 April 29, 2018 Closed 48 SAMI-2: two-dimensional Doppler imaging of tokamak plasmas EPSRC £1,065,280 Jan. 1, 2019 May 31, 2021 Closed 49 The Collective of Transform Ensembles (COTE) for Time Series Classification EPSRC £635,606 April 30, 2015 Oct. 31, 2018 Closed 50 The Collective of Transform Ensembles (COTE) for Time Series Classification EPSRC £1,589,015 April 30, 2015 Oct. 31, 2018 Closed 51 Channel Decoder Architectures for Energy-Constrained Wireless Communication Systems: Holistic Approach EPSRC £632,078 Oct. 11, 2012 April 14, 2016 Closed 52 Channel Decoder Architectures for Energy-Constrained Wireless Communication Systems: Holistic Approach EPSRC £1,580,195 Oct. 11, 2012 April 15, 2016 Closed 53 Scalable Non-invasive Radiometric Wireless Sensor Network for Partial Discharge Monitoring in the Future Smart Grid EPSRC £1,120,324 April 2, 2013 March 31, 2018 Closed 54 Scalable Non-invasive Radiometric Wireless Sensor Network for Partial Discharge Monitoring in the Future Smart Grid EPSRC £2,800,810 April 2, 2013 April 1, 2018 Closed 55 Layered copper oxychalcogenides for next generation p-type transparent conductors EPSRC £788,330 Feb. 1, 2020 April 29, 2023 Active 56 Layered copper oxychalcogenides for next generation p-type transparent conductors EPSRC £1,970,825 Feb. 1, 2020 Aug. 30, 2023 Closed 57 System Transition to Digital Energy EPSRC £120,930 May 31, 2017 Nov. 30, 2017 Closed 58 System Transition to Digital Energy EPSRC £302,325 May 31, 2017 Nov. 30, 2017 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »