Home Projects More like: VOLTNET: Smart Sensor Network for Powerline Monitoring with Machine Learning [Clear] # Title Funder Funding Start End Status 1 VOLTNET: Smart Sensor Network for Powerline Monitoring with Machine Learning Innovate UK £212,780 May 31, 2013 May 30, 2014 Closed 2 SYNAPS - SYNchronous Automation and Protection System EPSRC £486,570 May 31, 2015 May 30, 2017 Closed 3 SYNAPS (Synchronous Analysis and Protection System) EPSRC £398,590 Nov. 1, 2015 Jan. 31, 2018 Closed 4 SYNAPS - SYNchronous Automation and Protection System EPSRC £1,216,425 May 31, 2015 May 31, 2017 Closed 5 SYNAPS (Synchronous Analysis and Protection System) EPSRC £996,475 Nov. 1, 2015 Jan. 31, 2018 Closed 6 Extend functionality of Smart Isolators to low-voltage grid monitoring Innovate UK £60,000 Aug. 31, 2023 Nov. 30, 2023 Active 7 Transforming electricity access through smart sensors and grid efficiency algorithms EPSRC £220,984 Feb. 1, 2018 July 30, 2019 Closed 8 Transforming electricity access through smart sensors and grid efficiency algorithms EPSRC £552,460 Feb. 1, 2018 July 31, 2019 Closed 9 SinePost for a Low Carbon Future Innovate UK £175,580 Aug. 31, 2016 Aug. 30, 2017 Closed 10 SinePost for a Low Carbon Future Innovate UK £438,950 Aug. 31, 2016 Aug. 31, 2017 Closed 11 Synchronisation Network for Monitoring of Low Voltage Electricity Networks SYNET Innovate UK £29,368 Aug. 31, 2012 Dec. 31, 2012 Closed 12 Synchronisation Network for Monitoring of Low Voltage Electricity Networks SYNET Innovate UK £73,420 Aug. 31, 2012 Dec. 31, 2012 Closed 13 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £370,240 Feb. 1, 2019 July 30, 2020 Closed 14 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £925,600 Feb. 1, 2019 July 31, 2020 Closed 15 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £196,306 Oct. 4, 2010 Jan. 4, 2013 Closed 16 Inverter connected battery technology with advanced fault ride through capability on LV grid system to help offset the need for standby generation EPSRC £490,765 Oct. 4, 2010 Jan. 4, 2013 Closed 17 Reduction of Energy Demand in Buildings through Optimal Use of Wireless Behaviour Information (Wi-be) Systems EPSRC £1,195,256 Sept. 30, 2010 Aug. 30, 2012 Closed 18 Reduction of Energy Demand in Buildings through Optimal Use of Wireless Behaviour Information (Wi-be) Systems EPSRC £308,852 Aug. 31, 2012 Sept. 29, 2013 Closed 19 Reduction of Energy Demand in Buildings through Optimal Use of Wireless Behaviour Information (Wi-be) Systems EPSRC £2,988,140 Sept. 30, 2010 Aug. 31, 2012 Closed 20 Reduction of Energy Demand in Buildings through Optimal Use of Wireless Behaviour Information (Wi-be) Systems EPSRC £772,130 Aug. 31, 2012 Sept. 30, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »