Home Projects More like: Klick Fit Sensors for non-invasive real-time power cable measurements for challenging conditions [Clear] # Title Funder Funding Start End Status 1 Klick Fit Sensors for non-invasive real-time power cable measurements for challenging conditions Innovate UK £49,346 July 31, 2012 Dec. 31, 2012 Closed 2 FLYBUS -Flywheel Based Mechanical Hybrid System for Bus & Commercial Vehicle Applications including Retrofit Programme Innovate UK £1,011,070 Jan. 1, 2010 May 30, 2011 Closed 3 GaN devices for more powerful electronics EPSRC £0 July 31, 2017 Nov. 30, 2018 Closed 4 Establishing links between process parameters and product performance in the manufacture of battery electrode materials for automotive applications. EPSRC £0 Oct. 1, 2017 Sept. 29, 2021 Closed 5 High-Bandwidth Sensing for Wide-bandgap Power Conversion EPSRC £5,753,310 Feb. 1, 2023 Sept. 30, 2028 Active 6 High-Bandwidth Sensing for Wide-bandgap Power Conversion EPSRC £1,150,662 July 31, 2022 July 30, 2027 Active 7 Development of techniques & methods for sampling, calibration and testing of hydrogen purity for fuel cell vehicles EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 8 Electric cooking for low income communities EPSRC, NERC £0 Sept. 30, 2018 June 30, 2022 Closed 9 EPSRC Centre for Doctoral Training for Sustainable Electric Propulsion (CDT SEP) EPSRC £27,437,912 March 31, 2019 Sept. 30, 2027 Active 10 EPSRC Centre for Doctoral Training for Sustainable Electric Propulsion (CDT SEP) EPSRC £10,807,385 March 31, 2019 Sept. 29, 2027 Active 11 High precision temperature measurements for reacting flows EPSRC £850,036 Jan. 28, 2014 July 26, 2017 Closed 12 Reliawind Limited – Study, assessment and proof of market potentials and economics of a new condition monitoring technology for wind turbine applications Innovate UK £50,000 March 31, 2014 Sept. 29, 2014 Closed 13 Power Unit for Range Extension (PURE) Innovate UK £1,332,414 April 30, 2012 July 30, 2014 Closed 14 Battery Thermal Management and Algorithmic 3D Temperature Prediction EPSRC £0 May 31, 2019 Jan. 31, 2023 Active 15 Entrust smart community EV charging hub for light electric vehicles in Uganda Innovate UK £119,824 Nov. 1, 2020 April 29, 2021 Closed 16 Data Mining of Transformer Frequency Response Analysis (FRA) Results for Characterisation and Interpretation EPSRC £0 Sept. 30, 2017 Sept. 30, 2021 Closed 17 Wireless Power Transfer (WPT) for Electric Vehicles (EVs) EPSRC, NERC £0 Sept. 30, 2019 June 22, 2023 Closed 18 Modulator-free Performance-Oriented Control (MfPOC) for Direct Electric Drives EPSRC £1,973,075 March 1, 2023 Feb. 28, 2026 Active 19 Modulator-free Performance-Oriented Control (MfPOC) for Direct Electric Drives EPSRC £394,615 Aug. 31, 2022 Aug. 30, 2025 Active 20 ContRol methods for rELiable sensIng informAtion in interConnected Energy systems EPSRC £1,887,685 Jan. 1, 2023 Dec. 31, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »