Home Projects More like: Novel co-blended polymer matrix systems for fire resistant structural marine composites [Clear] # Title Funder Funding Start End Status 1 Novel co-blended polymer matrix systems for fire resistant structural marine composites EPSRC £854,158 July 18, 2010 July 17, 2014 Closed 2 Novel co-blended polymer matrix systems for fire resistant structural marine composites EPSRC £2,135,395 July 18, 2010 July 18, 2014 Closed 3 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 4 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 5 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK £1,026,654 June 30, 2022 June 29, 2024 Active 6 Recyclable wind turbine blades - in-situ polymerising thermoplastics (LV_Wind) Innovate UK £5,133,270 June 30, 2022 June 30, 2024 Active 7 Engineering with Graphene for Multi-functional Coatings and Fibre-Composites EPSRC £4,064,373 Feb. 1, 2013 April 29, 2017 Closed 8 Studies of coatings, lifetime and circular economy of resin-wood composites EPSRC £0 Sept. 30, 2019 July 30, 2021 Closed 9 Studies of coatings, lifetime and circular economy of resin-wood composites EPSRC £0 Sept. 30, 2019 July 31, 2021 Closed 10 NanoTool - Nano-enhanced lightweight composite tooling Innovate UK £1,438,715 July 31, 2018 July 31, 2019 Closed 11 Fire protection of lightweight EV battery cases using nanotechnology (PFP_Nano) Innovate UK £188,150 Nov. 1, 2020 April 29, 2021 Closed 12 TSB Development of an innovative radar absorbing composite structure for wind turbine blades Innovate UK £782,832 Feb. 1, 2008 Aug. 30, 2010 Closed 13 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £1,109,806 Aug. 31, 2010 Nov. 30, 2013 Closed 14 Tidal Turbine Blades - Maximising Reliability and Performance and Reducing Cost (BMAX) Innovate UK £2,774,515 Aug. 31, 2010 Nov. 30, 2013 Closed 15 THE FUTURE COMPOSITES MANUFACTURING HUB EPSRC £54,153,955 Jan. 1, 2017 June 30, 2024 Active 16 resinSENSE - real-time, on-line monitoring of resin mix-ratio monitoring system Innovate UK £194,266 Aug. 31, 2022 Sept. 29, 2023 Active 17 resinSENSE - real-time, on-line monitoring of resin mix-ratio monitoring system Innovate UK £971,330 Aug. 31, 2022 Sept. 30, 2023 Closed 18 Fatigue and damage tolerance of 3D-woven composites EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 19 Fibre waviness defects in composite structures EPSRC £501,840 April 30, 2009 April 29, 2012 Closed 20 Fibre waviness defects in composite structures EPSRC £519,408 April 30, 2009 July 30, 2012 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »