Home Projects More like: HERMES: High dEnsity Silicon GeRManium intEgrated photonicS [Clear] # Title Funder Funding Start End Status 41 Production engineering research for the manufacture of novel electronically functional yarns for multifunctional smart textiles EPSRC £6,614,520 July 31, 2019 July 31, 2023 Closed 42 Metal Atoms on Surfaces & Interfaces (MASI) for Sustainable Future EPSRC £13,319,026 July 31, 2021 July 30, 2026 Active 43 Metal Atoms on Surfaces & Interfaces (MASI) for Sustainable Future EPSRC £33,297,565 July 31, 2021 July 31, 2026 Active 44 Rational design of solid-state semiconductor-sensitized solar cells: from materials modelling to device fabrication EPSRC £1,978,978 Sept. 30, 2012 March 30, 2017 Closed 45 Rational design of solid-state semiconductor-sensitized solar cells: from materials modelling to device fabrication EPSRC £4,947,445 Sept. 30, 2012 March 31, 2017 Closed 46 Energy Storage Electrode Manufacturing (ELEMENT) EPSRC £201,580 June 30, 2017 Dec. 31, 2018 Closed 47 Energy Storage Electrode Manufacturing (ELEMENT) EPSRC £503,950 June 30, 2017 Dec. 31, 2018 Closed 48 Silicon Compatible GaN Power Electronics EPSRC £12,393,434 March 1, 2013 Aug. 30, 2018 Closed 49 Silicon Compatible GaN Power Electronics EPSRC £30,983,585 March 1, 2013 Aug. 31, 2018 Closed 50 Ultra-Stable High-Performance Nanolasers EPSRC £779,912 Jan. 1, 2017 Dec. 31, 2019 Closed 51 Ultra-Stable High-Performance Nanolasers EPSRC £1,949,780 Jan. 1, 2017 Dec. 31, 2019 Closed 52 Electrophysiology chip on a microfluidic platform BBSRC £978,556 Feb. 1, 2011 July 30, 2014 Closed 53 Implementing Lubrication in Micro-Electro-Mechanical Systems EPSRC £470,212 June 30, 2013 June 29, 2015 Closed 54 JPI Urban Europe SUGI - Urbanising in Place ESRC £695,825 April 1, 2018 April 1, 2021 Closed 55 Efficiency Enhancement of Silicon Photovoltaic Solar Cells by Passivation EPSRC £1,033,946 Aug. 31, 2012 Aug. 30, 2015 Closed 56 Efficiency Enhancement of Silicon Photovoltaic Solar Cells by Passivation EPSRC £2,584,865 Aug. 31, 2012 Aug. 31, 2015 Closed 57 High permittivity dielectrics on Ge for end of Roadmap application EPSRC £1,073,780 March 31, 2011 March 30, 2014 Closed 58 Black Silicon Photovoltaics EPSRC £4,749,380 Feb. 1, 2018 May 31, 2022 Closed 59 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £199,530 April 16, 2013 Aug. 15, 2015 Closed 60 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £498,825 April 16, 2013 Aug. 16, 2015 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »