# Title Funder Funding Start End Status
1 Multi-objective performance-based design of tall buildings using energy harvesting enabled tuned mass-damper-inerter (TMDI) devices EPSRC
£1,253,690
Jan. 1, 2015 Sept. 30, 2017 Closed
2 Active Vibration Control of Parametrically Excited Systems EPSRC
£494,920
April 29, 2013 April 29, 2015 Closed
3 Intelligent Structures for Low Noise Environments EPSRC
£8,515,940
Dec. 1, 2018 May 31, 2024 Active
4 Intelligent Structures for Low Noise Environments EPSRC
£3,406,376
Dec. 1, 2018 Nov. 30, 2023 Active
5 Advanced Measurement, Modelling and Utilisation of Bouncing and Jumping Loading Induced by Groups and Crowds EPSRC
£197,824
Nov. 1, 2013 May 31, 2015 Closed
6 Active wind farm control via morphing blade technology EPSRC
£0
Sept. 30, 2022 Sept. 30, 2025 Active
7 Multidomain Vibration-Absorber Design EPSRC
£2,003,542
March 31, 2020 March 30, 2025 Active
8 SMARTER: Smart Multifunctional ARchitecture & Technology for Energy aware wireless sensoRs EPSRC
£820,918
April 30, 2014 March 30, 2016 Closed
9 SMARTER: Smart Multifunctional ARchitecture & Technology for Energy aware wireless sensoRs EPSRC
£929,372
Sept. 30, 2012 Oct. 31, 2013 Closed
10 En-ComE: Energy Harvesting Powered Wireless Monitoring Systems Based on Integrated Smart Composite Structures and Energy-Aware Architecture EPSRC
£1,260,578
April 14, 2014 Oct. 13, 2017 Closed
11 En-ComE: Energy Harvesting Powered Wireless Monitoring Systems Based on Integrated Smart Composite Structures and Energy-Aware Architecture EPSRC
£3,151,445
April 14, 2014 Oct. 14, 2017 Closed
12 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£202,124
May 31, 2018 June 29, 2020 Closed
13 Passive vibration control of a floating hydrostatic transmission wind turbine and theoretical extensions EPSRC
£505,310
May 31, 2018 June 30, 2020 Closed
14 Compressive Sensing for Wireless Vibration-Based Structural Health Monitoring of Civil Engineering Structures EPSRC
£195,022
Aug. 26, 2013 May 25, 2015 Closed
15 Engineering Nonlinearity EPSRC
£7,537,866
Dec. 6, 2013 Sept. 5, 2017 Closed
16 Engineering Nonlinearity EPSRC
£8,428,172
Sept. 6, 2012 Sept. 5, 2013 Closed
17 Engineering Nonlinearity EPSRC
£18,844,665
Dec. 6, 2013 Sept. 6, 2017 Closed
18 Engineering Nonlinearity EPSRC
£21,070,430
Sept. 6, 2012 Sept. 6, 2013 Closed
19 Layered Oxides Thermoelectrics for High Temperature Waste heat Recovery EPSRC
£502,895
Sept. 30, 2016 Dec. 31, 2017 Closed
20 Layered Oxides Thermoelectrics for High Temperature Waste heat Recovery EPSRC
£201,158
Sept. 30, 2016 Dec. 31, 2017 Closed
Reset