# Title Funder Funding Start End Status
41 Hydrogen and Fuel Cell Supergen Hub EPSRC
£20,504,775
April 30, 2012 April 30, 2017 Closed
42 Electrodes by Design - Microstructural Engineering of High Performance Electrodes for Solid Oxide Fuel Cells EPSRC
£2,494,730
April 30, 2015 Oct. 31, 2018 Closed
43 Electrodes by Design - Microstructural Engineering of High Performance Electrodes for Solid Oxide Fuel Cells EPSRC
£6,236,825
April 30, 2015 Oct. 31, 2018 Closed
44 Mitochondrial ubiquitin dynamics and apoptotic cell death. MRC
£2,794,620
May 2, 2016 May 2, 2019 Closed
45 Peer-to-Peer Energy Trading and Sharing - 3M (Multi-times, Multi-scales, Multi-qualities) EPSRC
£1,960,724
Aug. 31, 2016 Feb. 29, 2020 Closed
46 Peer-to-Peer Energy Trading and Sharing - 3M (Multi-times, Multi-scales, Multi-qualities) EPSRC
£4,901,810
Aug. 31, 2016 Feb. 29, 2020 Closed
47 Mixed cation- and anion-exchange hybrid membranes for use in fuel cells, redox flow batteries and electrodialysis cells EPSRC
£777,962
June 13, 2010 Dec. 13, 2013 Closed
48 Mixed cation- and anion-exchange hybrid membranes for use in fuel cells, redox flow batteries and electrodialysis cells EPSRC
£1,944,905
June 13, 2010 Dec. 13, 2013 Closed
49 Reinventing the Solid Oxide Fuel Cell: Towards 200C operation EPSRC
£392,904
June 30, 2017 Feb. 28, 2019 Closed
50 Reinventing the Solid Oxide Fuel Cell: Towards 200C operation EPSRC
£982,260
June 30, 2017 Feb. 28, 2019 Closed
51 Hydrogen and Fuel Cells Hub Extension (H2FC SUPERGEN) EPSRC
£6,746,232
April 30, 2017 Dec. 31, 2022 Active
52 Hydrogen and Fuel Cells Hub Extension (H2FC SUPERGEN) EPSRC
£16,865,580
April 30, 2017 Dec. 31, 2022 Closed
53 Real-Time H2 Purification and Monitoring for Efficient and Durable Fuel Cell Vehicles EPSRC
£2,011,640
March 14, 2014 Sept. 12, 2018 Closed
54 Real-Time H2 Purification and Monitoring for Efficient and Durable Fuel Cell Vehicles EPSRC
£5,029,100
March 14, 2014 Sept. 13, 2018 Closed
55 Multiscale in-situ characterisation of degradation and reactivity in solid oxide fuel cells EPSRC
£1,633,302
May 31, 2012 April 29, 2016 Closed
56 The Supergen Biological Fuel Cells Consortium 2010-2014 (CORE) EPSRC
£6,748,084
April 17, 2010 Oct. 14, 2014 Closed
57 The Supergen Biological Fuel Cells Consortium 2010-2014 (CORE) EPSRC
£16,870,210
April 17, 2010 Oct. 15, 2014 Closed
58 Sustainable Coatings by Rational Design (SusCoRD) EPSRC
£7,686,087
Nov. 1, 2018 June 29, 2024 Active
59 Synthesis and NMR Studies of Electron and Proton Conducting Mesoporous Nb, Ta and Ti Oxide Composites for Alternative Energy Applications EPSRC
£605,688
June 30, 2011 March 1, 2015 Closed
60 Recovery of metal value from end of life PEMFC EPSRC
£188,602
Oct. 21, 2013 Jan. 21, 2015 Closed
Reset