# Title Funder Funding Start End Status
61 Flexible Routes to Liquid Fuels from CO2 by Advanced Catalysis and Engineering EPSRC
£3,608,530
March 30, 2016 Sept. 29, 2020 Closed
62 Flexible Routes to Liquid Fuels from CO2 by Advanced Catalysis and Engineering EPSRC
£9,021,325
March 30, 2016 Sept. 30, 2020 Closed
63 Elucidation of membrane interface chemistry for electro-chemical processes EPSRC
£3,351,332
March 1, 2017 Aug. 30, 2021 Closed
64 New Approach to Extend Durability of Sorbent Powders for Multicycle High Temperature CO2 Capture in Hydrogen EPSRC
£837,720
Nov. 1, 2012 Oct. 31, 2014 Closed
65 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC
£2,803,272
Nov. 1, 2011 Jan. 31, 2013 Closed
66 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC
£2,037,252
Feb. 1, 2013 July 8, 2016 Closed
67 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC
£5,093,130
Feb. 1, 2013 July 9, 2016 Closed
68 Development and Integration of Biomass and Concentrating Photovoltaic System for Rural and Urban Energy Bridge: BioCPV EPSRC
£7,008,180
Nov. 1, 2011 Jan. 31, 2013 Closed
69 Metal organic frameworks as catalysts for improving the efficiency of photocatalytic reactions 1=Energy 2=Catalysis EPSRC, NERC
£0
July 31, 2018 Oct. 31, 2022 Closed
70 Oxy-hybrid Power Cycle with Advanced Heat Recovery Network EPSRC
£147,616
Feb. 24, 2014 Feb. 23, 2015 Closed
71 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC
£2,199,782
Dec. 1, 2014 May 30, 2018 Closed
72 Selective Exhaust Gas Recirculation for Carbon Capture with Gas Turbines: Integration, Intensification, Scale-up and Optimisation. EPSRC
£5,499,455
Dec. 1, 2014 May 31, 2018 Closed
73 Deep Decarbonisation of a Sugar Refinery – Feasibility, Engineering and Wider Replicability of This Technology Innovate UK
£1,064,724
Aug. 31, 2021 Aug. 30, 2022 Closed
74 Can CO2 hydrate formation act as a safety factor for subsurface storage of CO2? EPSRC
£595,198
March 1, 2006 April 29, 2009 Closed
75 Can CO2 hydrate formation act as a safety factor for subsurface storage of CO2? EPSRC
£1,487,995
March 1, 2006 April 30, 2009 Closed
76 Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Plants - AMPGas EPSRC
£2,222,520
Aug. 31, 2012 Aug. 30, 2016 Closed
77 Adsorption Materials and Processes for Carbon Capture from Gas-Fired Power Plants - AMPGas EPSRC
£5,556,300
Aug. 31, 2012 Aug. 31, 2016 Closed
78 CO2 Post-Combustion Capture Using Amine Impregnated Synthetic Zeolites EPSRC
£960,510
Jan. 1, 2014 Dec. 31, 2016 Closed
79 Efficient low carbon energy storage and conversion on exsolved interfaces EPSRC
£1,044,508
June 24, 2018 July 25, 2022 Closed
80 From atoms to plant: co-production of green transport fuel and levoglucosan from waste biomass EPSRC
£504,920
March 1, 2019 June 30, 2019 Closed
Reset