# Title Funder Funding Start End Status
1 All Electrical Drive Train for Marine Energy Converters (EDRIVE-MEC) EPSRC
£1,712,262
March 31, 2016 Aug. 30, 2019 Closed
2 All Electrical Drive Train for Marine Energy Converters (EDRIVE-MEC) EPSRC
£4,280,655
March 31, 2016 Aug. 31, 2019 Closed
3 MU-EDRIVE EPSRC
£3,943,170
Aug. 31, 2021 Aug. 31, 2024 Active
4 High Torque Electrical Machine Innovate UK
£192,602
Nov. 1, 2020 July 30, 2021 Closed
5 Control of inverter-based distributed generation in low-inertia power systems EPSRC
£0
Sept. 29, 2019 March 30, 2023 Active
6 Control of inverter-based distributed generation in low-inertia power systems EPSRC
£0
Sept. 29, 2019 June 30, 2023 Closed
7 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC
£2,398,464
Nov. 1, 2018 Oct. 31, 2022 Active
8 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC
£5,996,160
Nov. 1, 2018 Oct. 31, 2022 Closed
9 Integration of wave and offshore wind energies EPSRC
£0
Sept. 30, 2022 Sept. 29, 2025 Active
10 Integration of wave and offshore wind energies EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
11 Unconventional Generators for Wind Applications EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
12 Unconventional Generators for Wind Applications EPSRC, NERC
£0
Sept. 30, 2019 Jan. 18, 2024 Active
13 The capability of the WITT Wave Energy Convertor to generate megawatts of offshore power at a competitive LCOE Innovate UK
£389,988
May 31, 2015 Nov. 30, 2016 Closed
14 The capability of the WITT Wave Energy Convertor to generate megawatts of offshore power at a competitive LCOE Innovate UK
£974,970
May 31, 2015 Nov. 30, 2016 Closed
15 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC
£400,894
Oct. 2, 2016 Oct. 1, 2018 Closed
16 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC
£1,002,235
Oct. 2, 2016 Oct. 2, 2018 Closed
17 The Kelp System Innovate UK
£48,878
Nov. 1, 2022 April 29, 2023 Active
18 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£1,568,907
Nov. 1, 2021 Oct. 31, 2024 Active
19 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£691,414
Oct. 3, 2021 Oct. 2, 2024 Active
20 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£266,638
Aug. 31, 2021 Aug. 30, 2024 Active
Reset