# Title Funder Funding Start End Status
21 Holistic Advanced Prototyping and Interfacing for Wave Energy Control EPSRC
£2,004,248
Sept. 30, 2021 Sept. 29, 2024 Active
22 Holistic Advanced Prototyping and Interfacing for Wave Energy Control EPSRC
£5,010,620
Sept. 30, 2021 Sept. 30, 2024 Active
23 Wave Energy Converter - Cost Effective Reliability Innovate UK
£616,640
Aug. 31, 2022 Feb. 29, 2024 Active
24 Mooring analysis and design for offshore WEC survivability and fatigue (MoorWEC) EPSRC
£2,026,678
Aug. 31, 2021 Aug. 30, 2024 Active
25 Mooring analysis and design for offshore WEC survivability and fatigue (MoorWEC) EPSRC
£5,066,695
Aug. 31, 2021 Aug. 31, 2024 Active
26 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC
£1,043,994
Aug. 31, 2008 Feb. 29, 2012 Closed
27 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC
£2,609,985
Aug. 31, 2008 Feb. 29, 2012 Closed
28 Flexible Responsive Systems in Wave Energy EPSRC
£69,928
Aug. 11, 2021 Aug. 10, 2024 Active
29 Flexible Responsive Systems in Wave Energy: FlexWave EPSRC
£583,568
Oct. 5, 2021 Oct. 4, 2024 Active
30 Flexible Responsive Systems in Wave Energy: FlexWave EPSRC
£1,346,770
Aug. 11, 2021 Aug. 10, 2024 Active
31 Flexible Responsive Systems in Wave Energy: FlexWave EPSRC
£3,366,925
Aug. 11, 2021 Jan. 11, 2025 Active
32 The Kelp System Innovate UK
£48,878
Nov. 1, 2022 April 29, 2023 Active
33 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£1,568,907
Nov. 1, 2021 Oct. 31, 2024 Active
34 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£691,414
Oct. 3, 2021 Oct. 2, 2024 Active
35 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£266,638
Aug. 31, 2021 Aug. 30, 2024 Active
36 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£2,025,440
Jan. 1, 2023 Jan. 31, 2025 Active
37 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC
£2,614,845
Nov. 1, 2021 Sept. 30, 2022 Closed
38 Numerical study of complex fluid-structure interaction EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
39 Numerical study of complex fluid-structure interaction EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
40 Modelling Marine Renewable Energy Devices; Designing for Survivability EPSRC
£5,198,085
June 29, 2012 Dec. 29, 2015 Closed
Reset