Home Projects More like: Testing and optimising a novel wave-energy device [Clear] # Title Funder Funding Start End Status 1 Feasibility Study for a Wave Energy Pilot Project in Indonesia Innovate UK £775,395 March 1, 2023 Feb. 29, 2024 Active 2 Large scale interactive coupled modelling of environmental impacts of marine renewable energy farms EPSRC £5,100,330 Sept. 30, 2012 March 31, 2016 Closed 3 Large scale interactive coupled modelling of environmental impacts of marine renewable energy farms EPSRC £2,040,132 Sept. 30, 2012 March 30, 2016 Closed 4 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £265,188 Aug. 28, 2014 May 30, 2018 Closed 5 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £1,276,114 Aug. 28, 2014 March 31, 2019 Closed 6 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £620,288 Aug. 28, 2014 March 31, 2019 Closed 7 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £3,190,285 Aug. 28, 2014 March 31, 2019 Closed 8 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £1,550,720 Aug. 28, 2014 March 31, 2019 Closed 9 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £662,970 Aug. 28, 2014 May 31, 2018 Closed 10 The capability of the WITT wave energy converter to generate megawatts of offshore power at a competitive LCOE EPSRC £96,352 June 30, 2015 Nov. 30, 2016 Closed 11 The capability of the WITT Wave Energy Converter to generate megawatts of offshore power at a competitive LCOE EPSRC £171,202 May 4, 2015 Aug. 30, 2016 Closed 12 The capability of the WITT wave energy converter to generate megawatts of offshore power at a competitive LCOE EPSRC £240,880 June 30, 2015 Nov. 30, 2016 Closed 13 The capability of the WITT Wave Energy Converter to generate megawatts of offshore power at a competitive LCOE EPSRC £428,005 May 4, 2015 Aug. 31, 2016 Closed 14 Multiscale Modelling of Metal-Semiconductor Contacts for the Next Generation of Nanoscale Transistors EPSRC £579,970 May 31, 2011 Oct. 31, 2014 Closed 15 Bio-inspired (Fe,Ni)S nano-catalysts for CO2 conversion EPSRC £2,277,754 April 30, 2010 Oct. 30, 2013 Closed 16 Bio-inspired (Fe,Ni)S nano-catalysts for CO2 conversion EPSRC £5,694,385 April 30, 2010 Oct. 30, 2013 Closed 17 Modelling Marine Renewable Energy Devices; Designing for Survivability EPSRC £5,198,085 June 29, 2012 Dec. 29, 2015 Closed 18 Development of silicon carbide plasma etch processes for next generation power electronics EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 19 Substitution and Sustainability in Functional Materials and Devices EPSRC £4,932,736 June 30, 2014 Dec. 30, 2019 Closed 20 Substitution and Sustainability in Functional Materials and Devices EPSRC £12,331,840 June 30, 2014 Dec. 30, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »