Home Projects More like: University of Dundee and Pelamis Wave Power Limited [Clear] # Title Funder Funding Start End Status 61 Low carbon marine eco engineering Innovate UK £49,968 Nov. 1, 2022 April 29, 2023 Active 62 The Influence of Climate Change on Future Ocean Conditions: Implications for Offshore Renewable Energy EPSRC £0 Nov. 1, 2020 Oct. 31, 2023 Active 63 The capability of the WITT Wave Energy Convertor to generate megawatts of offshore power at a competitive LCOE Innovate UK £389,988 May 31, 2015 Nov. 30, 2016 Closed 64 The capability of the WITT Wave Energy Convertor to generate megawatts of offshore power at a competitive LCOE Innovate UK £974,970 May 31, 2015 Nov. 30, 2016 Closed 65 Extreme deformations of magneto- and electro-active membranes: A framework to model instabilities due to large multi-physics loads in thin structures EPSRC £1,678,735 Jan. 1, 2022 June 30, 2024 Active 66 Reducing cost of energy for offshore wind through integrated wind turbine and support structure design leading to reduction of support structure cost Innovate UK £195,000 May 31, 2013 April 29, 2014 Closed 67 Blue Star FEED Innovate UK £1,770,735 Nov. 1, 2020 June 30, 2021 Closed 68 Statistical Modelling of Ocean Waves. EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 69 Reliability based Design Optimisation of Floating Offshore Wind Turbine Support Structures EPSRC £0 Sept. 30, 2022 March 30, 2026 Active 70 Offshore Renewable energy Cable Health using Integrated Distributed Sensor Systems Innovate UK £255,370 Nov. 1, 2015 April 30, 2016 Closed 71 Mimicrete – Advancing Self-Healing Concrete Using Vascular Networks. Innovate UK £315,250 June 30, 2022 Dec. 31, 2023 Active 72 Adapting a casting winch for a non-stop wave propelled USV ISCF £215,970 Feb. 1, 2023 July 31, 2023 Closed 73 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC £706,310 Oct. 14, 2019 June 29, 2023 Active 74 Extreme Loading on Floating Offshore Wind Turbines (FOWTs) under Complex Environmental Conditions EPSRC £88,548 March 2, 2020 March 1, 2023 Active 75 Extreme Loading on Floating Offshore Wind Turbines (FOWTs) under Complex Environmental Conditions EPSRC £126,780 Nov. 26, 2019 March 23, 2023 Active 76 Extreme Loading on Floating Offshore Wind Turbines (FOWTs) under Complex Environmental Conditions EPSRC £779,382 March 31, 2020 March 30, 2023 Active 77 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC £664,316 March 31, 2020 March 30, 2023 Active 78 Extreme Loading on FOWT under Complex Environmental Conditions EPSRC £1,765,775 Oct. 14, 2019 Feb. 29, 2024 Active 79 Characterisation of hydrodynamic loads on floating Wind Turbine Generator substructures EPSRC £0 Aug. 31, 2020 Aug. 30, 2024 Active 80 Design & production optimisation of a novel low embodied carbon concrete structural beam solution Innovate UK £49,200 Nov. 1, 2022 April 29, 2023 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »