Home Projects More like: Temperature dissipation across the power take-off system [Clear] # Title Funder Funding Start End Status 21 The Kelp System Innovate UK £48,878 Nov. 1, 2022 April 29, 2023 Active 22 The capability of the WITT wave energy converter to generate megawatts of offshore power at a competitive LCOE EPSRC £96,352 June 30, 2015 Nov. 30, 2016 Closed 23 The capability of the WITT Wave Energy Converter to generate megawatts of offshore power at a competitive LCOE EPSRC £171,202 May 4, 2015 Aug. 30, 2016 Closed 24 The capability of the WITT wave energy converter to generate megawatts of offshore power at a competitive LCOE EPSRC £240,880 June 30, 2015 Nov. 30, 2016 Closed 25 The capability of the WITT Wave Energy Converter to generate megawatts of offshore power at a competitive LCOE EPSRC £428,005 May 4, 2015 Aug. 31, 2016 Closed 26 Blue Star FEED Innovate UK £1,770,735 Nov. 1, 2020 June 30, 2021 Closed 27 Feasibility Study for a Wave Energy Pilot Project in Indonesia Innovate UK £775,395 March 1, 2023 Feb. 29, 2024 Active 28 Developing a WITT prototype which will harvest wave energy from all six degrees of motion for deployment and testing in marine buoy and small vessel applications Innovate UK £394,448 March 31, 2014 Feb. 28, 2017 Closed 29 Developing a WITT prototype which will harvest wave energy from all six degrees of motion for deployment and testing in marine buoy and small vessel applications Innovate UK £986,120 March 31, 2014 Feb. 28, 2017 Closed 30 Energy and the Physical Sciences:Beta-enhanced thermionic energy converters and nuclear batteries employing nanostructured diamond electrodes EPSRC £4,759,730 March 31, 2013 Sept. 30, 2016 Closed 31 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £1,568,907 Nov. 1, 2021 Oct. 31, 2024 Active 32 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £691,414 Oct. 3, 2021 Oct. 2, 2024 Active 33 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £266,638 Aug. 31, 2021 Aug. 30, 2024 Active 34 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £2,025,440 Jan. 1, 2023 Jan. 31, 2025 Active 35 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £2,614,845 Nov. 1, 2021 Sept. 30, 2022 Closed 36 MU-EDRIVE EPSRC £3,943,170 Aug. 31, 2021 Aug. 31, 2024 Active 37 Short Term Deterministic Wave Prediction as a Tool for Enhanced Performance with Survivability for Wave Energy Converters. EPSRC £831,320 Sept. 30, 2007 March 31, 2009 Closed 38 NaREC Marine Testing Facility (Nautilus) Innovate UK £22,514,716 Aug. 31, 2009 Sept. 29, 2013 Closed 39 NaREC Marine Testing Facility (Nautilus) Innovate UK £56,286,790 Aug. 31, 2009 Sept. 30, 2013 Closed 40 Next generation coastal protection with Bio-based Electrochemical Artificial Reefs(BEARs) Innovate UK £976,515 Sept. 30, 2022 Oct. 31, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »