Home Projects More like: Assessment of novel WEC with rubber air - water interface - performance validation - optimisation and demonstration of associated cost benefits [Clear] # Title Funder Funding Start End Status 21 Hydrodynamics-informed multi-objective control optimisation for tidal power plant systems integration EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 22 Hydrodynamics-informed multi-objective control optimisation for tidal power plant systems integration EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 23 Nanocrystalline Water Splitting Photodiodes II: Device Engineering, Integration and Scale-up EPSRC £1,459,240 April 30, 2011 April 30, 2014 Closed 24 Nanocrystalline Water Splitting Photodiodes II: Device Engineering, Integration and Scale-up EPSRC £583,696 April 30, 2011 April 29, 2014 Closed 25 High resolution mapping of performance and degradation mechanisms in printable photovoltaic devices EPSRC £2,071,714 July 31, 2015 Jan. 31, 2019 Closed 26 Developing an experimental functional map of polymer electrolyte fuel cell operation EPSRC £72,934 March 2, 2009 March 1, 2012 Closed 27 Developing an experimental functional map of polymer electrolyte fuel cell operation EPSRC £602,208 March 31, 2009 March 30, 2012 Closed 28 Developing an experimental functional map of polymer electrolyte fuel cell operation EPSRC £1,505,520 March 31, 2009 March 31, 2012 Closed 29 The Development of Advanced Technologies and Modelling Capabilities to Improve the Safety and Performance of Nuclear Fuel EPSRC £5,821,380 Jan. 6, 2011 Dec. 31, 2014 Closed 30 Rational design of solid-state semiconductor-sensitized solar cells: from materials modelling to device fabrication EPSRC £1,978,978 Sept. 30, 2012 March 30, 2017 Closed 31 Rational design of solid-state semiconductor-sensitized solar cells: from materials modelling to device fabrication EPSRC £4,947,445 Sept. 30, 2012 March 31, 2017 Closed 32 Mathematical model of solar cells EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 33 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC £483,202 Aug. 31, 2014 Aug. 30, 2017 Closed 34 Multi Vector Energy Distribution System Modelling and Optimisation with Integrated Demand Side Response EPSRC £1,208,005 Aug. 31, 2014 Aug. 31, 2017 Closed 35 New approaches for the manufacture of energy storage devices EPSRC £0 Sept. 30, 2016 March 30, 2020 Closed 36 Diamond Electronics in Robotics EPSRC £0 Feb. 3, 2020 May 2, 2024 Active 37 BxCyNz nanostructures for next generation energy storage systems EPSRC £0 Sept. 30, 2018 Sept. 29, 2022 Active 38 Offshore Wind Turbine Foundation EPSRC £0 Sept. 30, 2016 Sept. 29, 2020 Closed 39 Offshore Wind Turbine Foundation EPSRC £0 Sept. 30, 2016 Sept. 30, 2020 Closed 40 STFC Batteries Network+ Phase 3 STFC £1,514,612 March 1, 2018 Feb. 29, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »