# Title Funder Funding Start End Status
41 ISCF Wave 1: Improved lifetime performance and safety of electrochemical energy stores through functionalization of passive materials and components UUI
£5,017,105
Sept. 30, 2017 May 31, 2021 Closed
42 MY-STORE: Multi-energY storage-Social, TechnO-economic, Regulatory and Environmental assessment under uncertainty EPSRC
£2,536,330
Jan. 1, 2016 Nov. 20, 2019 Closed
43 MY-STORE: Multi-energY storage-Social, TechnO-economic, Regulatory and Environmental assessment under uncertainty EPSRC
£6,340,825
Jan. 1, 2016 Nov. 20, 2019 Closed
44 Resilient Integrated-Coupled FOW platform design methodology (ResIn) EPSRC
£1,623,950
July 2, 2017 Jan. 2, 2021 Closed
45 Resilient Integrated-Coupled FOW platform design methodology (ResIn) Newton Fund
£4,059,875
July 2, 2017 Jan. 2, 2021 Closed
46 ISCF Wave 1:Designing Electrodes for Na Ion Batteries via Structure Electrochemical Performance Correlations EPSRC
£2,203,984
Jan. 1, 2018 Dec. 31, 2018 Closed
47 ISCF Wave 1:Designing Electrodes for Na Ion Batteries via Structure Electrochemical Performance Correlations EPSRC
£1,613,152
Jan. 1, 2019 Oct. 30, 2021 Closed
48 ISCF Wave 1:Designing Electrodes for Na Ion Batteries via Structure Electrochemical Performance Correlations UUI
£4,032,880
Jan. 1, 2019 Oct. 31, 2021 Closed
49 ISCF Wave 1:Designing Electrodes for Na Ion Batteries via Structure Electrochemical Performance Correlations UUI
£5,509,960
Jan. 1, 2018 Dec. 31, 2018 Closed
50 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC
£2,096,160
Sept. 29, 2014 March 28, 2018 Closed
51 Stability and Control of Power Networks with Energy Storage (STABLE-NET) EPSRC
£5,240,400
Sept. 29, 2014 March 29, 2018 Closed
52 MaxImiSing flexibility through multi-Scale IntegratiON of energy systems (MISSION) EPSRC
£1,257,744
June 28, 2018 May 30, 2022 Closed
53 Sustainable Processing of Energy Materials from Waste EPSRC
£1,625,610
April 30, 2019 Feb. 28, 2023 Active
54 Newton Fund: Practical hydrogen fuelled vehicles for China EPSRC
£855,054
March 31, 2017 Jan. 31, 2020 Closed
55 Complexes with Redox Non-Innocent Ligands for Flow Battery Energy Storage EPSRC
£199,340
Nov. 1, 2017 Dec. 31, 2018 Closed
56 Complexes with Redox Non-Innocent Ligands for Flow Battery Energy Storage EPSRC
£498,350
Nov. 1, 2017 Dec. 31, 2018 Closed
57 Lower Cost and Longer Life Flow Batteries for Grid Scale Energy Storage EPSRC
£1,881,376
June 29, 2014 June 28, 2017 Closed
58 Solid Oxide Interfaces for Faster Ion Transport (SOIFIT) EPSRC
£2,002,360
July 2, 2017 July 1, 2023 Active
59 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC
£5,991,000
July 31, 2013 Feb. 28, 2018 Closed
60 Flexible and Efficient Power Plant: Flex-E-Plant EPSRC
£9,985,000
July 31, 2013 Feb. 28, 2018 Closed
Reset