Home Projects More like: Power flow control in future electric vehicles and dc microgrids with multiple energy sources [Clear] # Title Funder Funding Start End Status 41 Exploration of Multilevel Current Source Converters EPSRC £195,774 June 29, 2014 March 30, 2016 Closed 42 Exploration of Multilevel Current Source Converters EPSRC £489,435 June 29, 2014 March 31, 2016 Closed 43 Data-driven Intelligent Energy Management System for a Micro Grid EPSRC £1,219,318 June 27, 2018 June 26, 2022 Closed 44 EPSRC Centre for Doctoral Training for Sustainable Electric Propulsion (CDT SEP) EPSRC £10,807,385 March 31, 2019 Sept. 29, 2027 Active 45 EPSRC Centre for Doctoral Training for Sustainable Electric Propulsion (CDT SEP) EPSRC £27,437,912 March 31, 2019 Sept. 30, 2027 Active 46 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £1,209,122 March 31, 2020 March 30, 2023 Active 47 Sustainable urban power supply through intelligent control and enhanced restoration of AC/DC networks EPSRC £3,022,805 March 31, 2020 March 31, 2024 Active 48 Developing FUTURE Vehicles (Fundamental Understanding of Technologies for Ultra Reduced Emission Vehicles) EPSRC £6,024,056 Dec. 1, 2011 May 30, 2016 Closed 49 Developing FUTURE Vehicles (Fundamental Understanding of Technologies for Ultra Reduced Emission Vehicles) UKRI £15,060,140 Dec. 1, 2011 May 31, 2016 Closed 50 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £591,264 Dec. 15, 2014 April 29, 2018 Closed 51 Mitigating the effect of low inertia and low short-circuit level in HVDC-rich AC grids EPSRC £1,478,160 Dec. 15, 2014 April 30, 2018 Closed 52 Responsive Algorithmic Enterprise (RAE) EPSRC £164,758 March 31, 2017 March 30, 2018 Closed 53 Responsive Algorithmic Enterprise (RAE) EPSRC £411,895 March 31, 2017 March 31, 2018 Closed 54 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC £1,760,862 March 31, 2013 March 30, 2016 Closed 55 Enhanced Renewable Integration through Flexible Transmission Options (ERIFT) EPSRC £4,402,155 March 31, 2013 March 31, 2016 Closed 56 Joint UK-India Clean Energy Centre (JUICE) EPSRC £10,188,872 Sept. 30, 2016 March 30, 2022 Closed 57 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £199,530 April 16, 2013 Aug. 15, 2015 Closed 58 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £498,825 April 16, 2013 Aug. 16, 2015 Closed 59 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC £2,398,464 Nov. 1, 2018 Oct. 31, 2022 Active 60 Insulation degradation and lifetime of inverter-fed machines with fast switching (high dv/dt) converters EPSRC £5,996,160 Nov. 1, 2018 Oct. 31, 2022 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »