Home Projects More like: Feasibility Assessment of ReliaWind Condition Monitoring Technology for Offshore Wind Turbine Drivetrains [Clear] # Title Funder Funding Start End Status 1 Feasibility Assessment of ReliaWind Condition Monitoring Technology for Offshore Wind Turbine Drivetrains Innovate UK £192,852 April 30, 2013 Feb. 28, 2014 Closed 2 Reliawind Condition Monitoring for Offshore Wind Turbines Innovate UK £10,000 April 30, 2014 Oct. 31, 2014 Closed 3 Reliawind Condition Monitoring for Offshore Wind Turbines Innovate UK £25,000 April 30, 2014 Oct. 31, 2014 Closed 4 Reliawind Limited – Study, assessment and proof of market potentials and economics of a new condition monitoring technology for wind turbine applications Innovate UK £50,000 March 31, 2014 Sept. 29, 2014 Closed 5 Wake Properties Prediction by means of machine learning algorithms EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 6 Wake Properties Prediction by means of machine learning algorithms EPSRC £0 Dec. 1, 2022 Nov. 30, 2026 Active 7 Wake Properties Prediction by means of machine learning algorithms EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Closed 8 Condition Monitoring OffshoreWind Turbine throughMachine Learning EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 9 Condition Monitoring OffshoreWind Turbine throughMachine Learning EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 10 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £370,240 Feb. 1, 2019 July 30, 2020 Closed 11 Renewable Energy Array Cable and Termination Instrumentation using Optical sensor Networks (REACTION) Innovate UK £925,600 Feb. 1, 2019 July 31, 2020 Closed 12 Offshore Floating Wind Turbine Operation & Maintenance EPSRC £0 Jan. 6, 2020 July 4, 2023 Active 13 Offshore Floating Wind Turbine Operation & Maintenance EPSRC £0 Jan. 6, 2020 July 5, 2023 Closed 14 SWEPT2 EPSRC £179,650 April 30, 2015 April 29, 2018 Closed 15 SWEPT2 EPSRC £449,125 April 30, 2015 April 30, 2018 Closed 16 Holistic Subsea Cable Fault Detection & Condition Monitoring System Innovate UK £1,858,337 April 30, 2021 Dec. 31, 2022 Active 17 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £2,580,280 June 30, 2021 June 29, 2026 Active 18 Accurate modelling of wind turbine wake spreading through consideration of realistic turbulent entrainment: revolutionising wind farm optimisation EPSRC £6,450,700 June 30, 2021 June 30, 2026 Active 19 Feasibility Study for a Multi-MW Ferrite Based Permanent Magnet Generator for Wind Turbines Innovate UK £150,000 May 31, 2020 Feb. 28, 2021 Closed 20 Feasibility Study for a Multi-MW Ferrite Based Permanent Magnet Generator for Wind Turbines Innovate UK £375,000 May 31, 2020 Feb. 28, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »