Home Projects More like: Characterisation of Soft Magnetic Materials for Metering Current Transformers and Other Low Flux Density Applications [Clear] # Title Funder Funding Start End Status 61 Photoperiodic and circadian clock mediated control of hydrocarbon production in botryococcus braunii. BBSRC £150,562 Sept. 30, 2010 Sept. 29, 2014 Closed 62 Photoperiodic and circadian clock mediated control of hydrocarbon production in botryococcus braunii. BBSRC £376,405 Sept. 30, 2010 Sept. 30, 2014 Closed 63 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC £201,454 March 21, 2017 May 23, 2018 Closed 64 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC £503,635 March 21, 2017 May 24, 2018 Closed 65 Substituted Di(thio)pyranylidenes and their CT Complexes with C60 for Organic Near-Infrared Detectors EPSRC £0 Jan. 1, 2018 June 29, 2021 Closed 66 Diamond magnetometry for finding corrosion in steel EPSRC £0 Sept. 5, 2021 Sept. 5, 2025 Active 67 High performance permanent magnets EPSRC £0 Nov. 1, 2016 Oct. 31, 2019 Closed 68 Future Electrical Machines Manufacturing Hub EPSRC £21,191,706 March 31, 2019 March 30, 2026 Active 69 Future Electrical Machines Manufacturing Hub EPSRC £53,679,810 March 31, 2019 March 31, 2026 Active 70 Remote Fissile Material Monitoring of Operational Reactor Cores Innovate UK £2,839,320 May 31, 2015 June 30, 2019 Closed 71 Applying muon spin rotation to understand the magnetic behaviour of metallic bionanoparticles EPSRC £280,694 July 3, 2011 Aug. 2, 2012 Closed 72 SUSTAIN Manufacturing Hub EPSRC £21,321,975 March 31, 2019 March 30, 2026 Active 73 SUSTAIN Manufacturing Hub EPSRC £54,264,940 March 31, 2019 Sept. 30, 2026 Active 74 DriveLAB* teaching and training products - Developing and delivering a pilot stage to meet the needs of academic, SME and industry for the training of electrification topics Innovate UK £49,892 Feb. 1, 2022 April 29, 2022 Closed 75 Hybrid Lightweight Structural Systems for Low-Cost Housing (HYLIGHTS) EPSRC £377,742 Aug. 31, 2022 Feb. 28, 2025 Active 76 HYBRID LIGHTWEIGHT STRUCTURAL SYSTEMS FOR LOW-COST HOUSING (HYLIGHTS) EPSRC £442,259 Aug. 31, 2022 Feb. 28, 2025 Active 77 HYBRID LIGHTWEIGHT STRUCTURAL SYSTEMS FOR LOW-COST HOUSING (HYLIGHTS) EPSRC £285,475 Aug. 31, 2022 Feb. 28, 2025 Active 78 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC £265,335 Oct. 31, 2006 Oct. 30, 2009 Closed 79 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC £508,230 Dec. 21, 2006 Dec. 20, 2009 Closed 80 Measurement and modelling of electrical, transport and phase-change phenomena and application to Vacuum Arc Remelting for Optimal Material Quality EPSRC £507,561 July 2, 2006 Oct. 1, 2009 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »