Home Projects More like: Preventing wide-area blackouts through adaptive islanding of transmission networks [Clear] # Title Funder Funding Start End Status 41 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC £1,341,844 March 1, 2013 Feb. 29, 2016 Closed 42 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC £3,354,610 March 1, 2013 Feb. 29, 2016 Closed 43 Study to understand market potential of urban Demand response in India, targeting domestic air conditioning Innovate UK £100,800 Feb. 1, 2017 April 30, 2017 Closed 44 Multilevel Inverter Topologies for MVDC EPSRC £0 Dec. 1, 2017 May 30, 2021 Closed 45 Multilevel Inverter Topologies for MVDC EPSRC £0 Dec. 1, 2017 May 31, 2021 Closed 46 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £626,438 Oct. 23, 2014 Oct. 22, 2018 Closed 47 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £701,926 Oct. 14, 2014 April 14, 2019 Closed 48 Dislocation-Microstructure Interaction at a Crack Tip - In Search of a Driving Force for Short Crack Growth EPSRC £803,262 Oct. 23, 2014 April 22, 2019 Closed 49 A Study on the Effectiveness of Blockchain Technologies and Energy Storage in the Electricity Distribution System EPSRC £0 Aug. 31, 2018 Oct. 14, 2022 Active 50 A Study on the Effectiveness of Blockchain Technologies and Energy Storage in the Electricity Distribution System EPSRC, NERC £0 Aug. 31, 2018 Oct. 15, 2022 Closed 51 A Low Cost, High Capacity, Smart Residential Distribution Network Enabled By SiC Power Electronics Innovate UK £738,308 Jan. 1, 2015 March 30, 2018 Closed 52 EMPOWER EPSRC £473,480 Aug. 31, 2010 Aug. 31, 2012 Closed 53 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 54 Control and operation of MVDC systems with grid forming capability for the future GB power system EPSRC £0 Sept. 30, 2020 Dec. 31, 2024 Active 55 Integrated Operation and Planning for Smart Electric Distribution Networks (OPEN) EPSRC £2,004,702 April 20, 2013 April 19, 2016 Closed 56 Integrated Operation and Planning for Smart Electric Distribution Networks (OPEN) EPSRC £5,011,755 April 20, 2013 April 20, 2016 Closed 57 The critical group of a topological graph: an approach through delta-matroid theory EPSRC £45,721 April 30, 2022 April 29, 2023 Active 58 The critical group of a topological graph: an approach through delta-matroid theory EPSRC £31,231 May 15, 2022 May 14, 2023 Active 59 The critical group of a topological graph: an approach through delta-matroid theory EPSRC £156,155 May 15, 2022 May 15, 2023 Closed 60 Data Mining of Transformer Frequency Response Analysis (FRA) Results for Characterisation and Interpretation EPSRC £0 Sept. 30, 2017 Sept. 30, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »