# Title Funder Funding Start End Status
21 LATENT: RESIDENTIAL HEAT AS AN ENERGY SYSTEM SERVICE EPSRC
£2,628,182
Sept. 30, 2020 Sept. 29, 2024 Active
22 LATENT: RESIDENTIAL HEAT AS AN ENERGY SYSTEM SERVICE EPSRC
£6,570,455
Sept. 30, 2020 Sept. 30, 2024 Active
23 Reducing heat demand in UK cities: Using complexity science to enable effective decision-making EPSRC
£567,578
Sept. 15, 2013 Sept. 14, 2016 Closed
24 Reducing heat demand in UK cities: Using complexity science to enable effective decision-making EPSRC
£1,418,945
Sept. 15, 2013 Sept. 15, 2016 Closed
25 Low Temperature Waste Heat to Power Generation EPSRC
£645,458
June 30, 2016 Dec. 31, 2019 Closed
26 Low Temperature Waste Heat to Power Generation EPSRC
£1,613,645
June 30, 2016 Dec. 31, 2019 Closed
27 EPSRC and SFI Centre for Doctoral Training in Energy Resilience and the Built Environment EPSRC
£11,473,301
Sept. 30, 2019 March 30, 2028 Active
28 EPSRC and SFI Centre for Doctoral Training in Energy Resilience and the Built Environment EPSRC
£29,281,480
Sept. 30, 2019 March 31, 2028 Active
29 Novel adsorbents applied to integrated energy-efficient industrial CO2 capture EPSRC
£4,927,310
June 30, 2016 Jan. 31, 2020 Closed
30 A versatile PCM energy storage system for building applications (Versatile PCM) EPSRC
£1,659,852
Sept. 30, 2020 Sept. 29, 2023 Active
31 A versatile PCM energy storage system for building applications (Versatile PCM) EPSRC
£4,149,630
Sept. 30, 2020 March 31, 2024 Active
32 Efficient low carbon energy storage and conversion on exsolved interfaces EPSRC
£1,044,508
June 24, 2018 July 25, 2022 Closed
33 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC
£1,997,756
March 31, 2016 March 31, 2019 Closed
34 FITS-LCD: Fabric Integrated Thermal Storage for Low-Carbon Dwellings EPSRC
£4,994,390
March 31, 2016 March 31, 2019 Closed
35 Demand profiles and flexibility insights from smart meter data EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
36 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,249,368
Jan. 2, 2019 June 30, 2023 Active
37 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,039,216
Jan. 2, 2019 June 30, 2023 Active
38 Geothermal Power Generated from UK Granites (GWatt) NERC
£2,598,040
Jan. 2, 2019 July 1, 2023 Closed
39 Geothermal Power Generated from UK Granites (GWatt) NERC
£3,123,420
Jan. 2, 2019 July 1, 2023 Closed
40 Geothermal Power Generated from UK Granites (GWatt) NERC
£1,302,924
Jan. 2, 2019 June 30, 2023 Active
Reset