Home Projects More like: PLAT-0 2 - Proving a Low Cost, Composite, Buoyant, Mid-Stream Tidal Turbine Platform at Full-Scale [Clear] # Title Funder Funding Start End Status 81 Tidal array cost reduction: Testing a removable nacelle design for DeltaStream Technology EPSRC £336,807 Jan. 7, 2016 July 5, 2017 Closed 82 Tidal array cost reduction: Testing a removable nacelle design for DeltaStream Technology EPSRC £561,345 Jan. 7, 2016 July 6, 2017 Closed 83 Design Feasibility Study for a Low Velocity Tidal Stream Turbine EPSRC £395,774 Jan. 1, 2018 Dec. 31, 2019 Closed 84 Design Feasibility Study for a Low Velocity Tidal Stream Turbine EPSRC £989,435 Jan. 1, 2018 Dec. 31, 2019 Closed 85 Windfarm Autonomous Ships Project (WASP) Innovate UK £1,334,978 Jan. 1, 2018 Dec. 31, 2019 Closed 86 Windfarm Autonomous Ships Project (WASP) EPSRC, ISCF £3,337,445 Jan. 1, 2018 Dec. 31, 2019 Closed 87 Unmanned Surface Vessels for Rapid Environmental Assessment in challenging inland waterways and tidal environments ISCF £3,318,135 Feb. 1, 2019 April 30, 2021 Closed 88 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £276,434 Feb. 1, 2019 April 29, 2020 Closed 89 Modelling the Impact of Large Floating Wind Turbines on Offshore Navigation and Safety Critical Radar Systems EPSRC £691,085 Feb. 1, 2019 April 30, 2020 Closed 90 Marine energy wet-mate connection system Innovate UK £113,954 Sept. 30, 2020 Dec. 31, 2020 Closed 91 Marine energy wet-mate connection system Innovate UK £284,885 Sept. 30, 2020 Dec. 31, 2020 Closed 92 FiLAment Winding multi-nozzLE, traversing winding head for enabling production of composite high-preSSure vessels (FLAWLESS) Innovate UK £49,943 Nov. 1, 2022 April 29, 2023 Active 93 FiLAment Winding multi-nozzLE, traversing winding head for enabling production of composite high-preSSure vessels (FLAWLESS) Innovate UK £149,829 Nov. 1, 2022 April 30, 2023 Closed 94 A composite scaffolding demonstrator Innovate UK £250,000 May 31, 2023 March 31, 2024 Active 95 Development of an advanced Vertical Axis Wind Turbine prototype capable of grid parity by X-Wind Power Limited Innovate UK £130,906 April 30, 2012 June 29, 2013 Closed 96 Development of an advanced Vertical Axis Wind Turbine prototype capable of grid parity by X-Wind Power Limited Innovate UK £327,265 April 30, 2012 June 30, 2013 Closed 97 ENERGY HARVESTING TECHNOLOGY FROM VESSEL MOTION Innovate UK £948,980 June 30, 2013 June 30, 2014 Closed 98 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC £200,696 Dec. 1, 2016 March 30, 2018 Closed 99 TorqTidal: Mitigating Torque Pulsations in Tidal Current Turbines EPSRC £501,740 Dec. 1, 2016 March 31, 2018 Closed 100 High Torque Electrical Machine Innovate UK £192,602 Nov. 1, 2020 July 30, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »