Home Projects More like: Unlocking the Potential of Model-Predictive Control in Non-domestic Building Energy Management: Automated Configuration and Optimisation of Control [Clear] # Title Funder Funding Start End Status 1 Control of Wind Power Generators EPSRC £0 Sept. 30, 2015 Aug. 25, 2016 Closed 2 Control of Wind Power Generators EPSRC £0 Sept. 30, 2015 Aug. 26, 2016 Closed 3 AI Enabled Control of Distributed Generation EPSRC £0 Sept. 30, 2022 March 31, 2026 Active 4 Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control) EPSRC £1,535,870 June 30, 2023 June 30, 2026 Active 5 Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control) EPSRC £2,183,495 June 29, 2023 June 29, 2026 Active 6 Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control) EPSRC £1,955,075 June 30, 2023 June 30, 2026 Active 7 Voltage control of G-protein-coupled receptor signalling MRC £505,854 Aug. 8, 2004 Feb. 8, 2008 Closed 8 CODES: The Control of District-heating Efficiency through Smart data-driven models ISCF £1,972,030 April 30, 2020 March 31, 2022 Closed 9 Fault tolerant control for increased safety and security of nuclear power plants EPSRC £1,180,740 Sept. 30, 2018 Aug. 31, 2023 Closed 10 REDUCTION OF ENERGY DEMAND IN PAPER MAKING USING ONLINE OPTIMISATION AND CONTROL EPSRC £757,840 May 31, 2009 Aug. 31, 2011 Closed 11 Direct Electric Drive Control for Electric Vehicles EPSRC £0 Sept. 30, 2022 March 31, 2026 Active 12 The establishment of load driven real-time energy utility tariffing for smart grid control of household appliances Innovate UK £50,000 April 30, 2011 July 30, 2011 Closed 13 The establishment of load driven real-time energy utility tariffing for smart grid control of household appliances Innovate UK £125,000 April 30, 2011 July 31, 2011 Closed 14 Increasing the share of renewable energy in future electric power grids through improved voltage control EPSRC £0 Jan. 1, 2023 June 30, 2026 Active 15 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £666,595 Aug. 31, 2021 Aug. 31, 2024 Active 16 System-level Co-design and Control of Large Capacity Wave Energy Converters with Multiple PTOs EPSRC £1,728,535 Oct. 3, 2021 Oct. 3, 2024 Active 17 Compact, laser-based gas analyser for remote, long-term process control of solid oxide fuel cells Innovate UK £50,000 April 30, 2011 July 30, 2011 Closed 18 Chemo-physico-mechanical characteristics of corrosion products and their correlation with corrosion control in geothermal environments EPSRC £0 Sept. 30, 2022 March 31, 2026 Active 19 HAWCS - Heating And hot Water Control over the Smart meter infrastructure Innovate UK £1,988,250 Aug. 31, 2010 March 31, 2011 Closed 20 Control of boundary layer streaks induced by free-stream turbulence using a novel velocity-pressure control framework. EPSRC £60,132 July 31, 2011 July 30, 2014 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »