Home Projects More like: SMARTRANGE [Clear] # Title Funder Funding Start End Status 21 Power Networks Research Academy EPSRC £5,421,200 Sept. 30, 2008 March 31, 2016 Closed 22 Integration of wave and offshore wind energies EPSRC £0 Sept. 30, 2022 Sept. 29, 2025 Active 23 Integration of wave and offshore wind energies EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 24 Impact of Grid Forming Converters on Power System Stability EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 25 Impact of Grid Forming Converters on Power System Stability EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 26 Differentiating UK capability: Reducing footprint and weight of high power, integrated PEMD Innovate UK £1,990,098 Feb. 1, 2022 Jan. 31, 2024 Active 27 Differentiating UK capability: Reducing footprint and weight of high power, integrated PEMD ISCF £9,950,485 Feb. 1, 2022 Jan. 31, 2024 Active 28 Sandpit: SUPERCAPACITORS FOR AN EFFECTIVE AND SUSTAINABLE POWER SYSTEM EPSRC £455,224 Sept. 30, 2009 Sept. 29, 2011 Closed 29 Sandpit: SUPERCAPACITORS FOR AN EFFECTIVE AND SUSTAINABLE POWER SYSTEM EPSRC £1,138,060 Sept. 30, 2009 Sept. 30, 2011 Closed 30 Gallium Nitride Smart Power Integrated Circuit Technology (GaN SPICe) EPSRC £1,004,940 Sept. 30, 2021 March 30, 2025 Active 31 Gallium Nitride Smart Power Integrated Circuit Technology (GaN SPICe) EPSRC £721,634 Sept. 30, 2021 March 30, 2025 Active 32 BRIGHTLASE - Power Scaled Supercontinuum White Light Lasers for High Power Lamp Replacement Innovate UK £419,758 Aug. 31, 2013 Nov. 30, 2014 Closed 33 BRIGHTLASE - Power Scaled Supercontinuum White Light Lasers for High Power Lamp Replacement Innovate UK £1,049,395 Aug. 31, 2013 Nov. 30, 2014 Closed 34 An innovative oxy-fired supercritical CO2 power cycle for highly flexible electricity generation EPSRC £0 Aug. 31, 2017 Aug. 30, 2019 Closed 35 An innovative oxy-fired supercritical CO2 power cycle for highly flexible electricity generation EPSRC £0 Aug. 31, 2017 Aug. 31, 2019 Closed 36 Smart Switching Devices for Energy Saving Power Electronics Applications Innovate UK £198,204 March 1, 2013 Sept. 29, 2014 Closed 37 Smart Switching Devices for Energy Saving Power Electronics Applications Innovate UK £495,510 March 1, 2013 Sept. 30, 2014 Closed 38 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £199,530 April 16, 2013 Aug. 15, 2015 Closed 39 Predictive Reliability Modelling and Characterization of Silicon Carbide Power MOS-Transistors in Grid-Connected Voltage Source Converters EPSRC £498,825 April 16, 2013 Aug. 16, 2015 Closed 40 Location of significant sources of power quality disturbance in electricity distribution networks EPSRC £0 Sept. 30, 2015 Sept. 29, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »