# | Title | Funder | Funding | Start | End | Status |
---|---|---|---|---|---|---|
1 | Use of Endwall Contouring to Improve the Efficiency of Gas Turbines | EPSRC | £0 |
June 30, 2019 | Sept. 29, 2023 | Active |
2 | Gas-Turbine and Governor Modelling and Benefits of Integrated Control of Embedded Generation Plant | EPSRC | £331,964 |
March 31, 2006 | March 30, 2009 | Closed |
3 | Novel Turbine Blade Design | Innovate UK | £10,000 |
July 31, 2014 | Jan. 31, 2015 | Closed |
4 | Development of a High Efficiency Axial Inflow Turbine for Application on a Downsized Gasoline Engine | EPSRC | £0 |
Sept. 30, 2018 | Sept. 29, 2021 | Closed |
5 | Gas Turbine Inlet Cooling upstream Air Filtration System | Innovate UK | £54,000 |
Sept. 30, 2011 | Jan. 31, 2012 | Closed |
6 | ALL-TTidal: Arrays of Long Life Turbines for Tidal | EPSRC | £245,256 |
Sept. 30, 2014 | June 29, 2015 | Closed |
7 | Strategies for reducing cost of Engineering Optimisation | EPSRC | £0 |
Sept. 30, 2019 | March 30, 2023 | Active |
8 | Strategies for reducing cost of Engineering Optimisation | EPSRC | £0 |
Sept. 30, 2019 | March 31, 2023 | Closed |
9 | Dynamic Loadings on Turbines in a Tidal Array (DyLoTTA) | EPSRC | £1,607,090 |
June 30, 2016 | March 30, 2020 | Closed |
10 | Gas Turbine Stator-Well Flow and Heat Transfer. | EPSRC | £0 |
Sept. 27, 2020 | Sept. 29, 2023 | Active |
11 | MFB4WTG | Innovate UK | £166,350 |
Nov. 1, 2019 | May 30, 2021 | Closed |
12 | CFD Study of Wind Turbine Aerodynamics | EPSRC | £0 |
Sept. 30, 2017 | Nov. 24, 2020 | Closed |
13 | Experimental measurements of the effect of hot gas ingestion on rotor discs | EPSRC | £199,372 |
Jan. 2, 2014 | Jan. 1, 2016 | Closed |
14 | Micro Turbine Renewable Energy Combustor (MiTREC) | Innovate UK | £1,871,320 |
Nov. 1, 2017 | March 31, 2019 | Closed |
15 | Micro Turbine Renewable Energy Combustor (MiTREC) | ISCF | £4,678,300 |
Nov. 1, 2017 | March 31, 2019 | Closed |
16 | Marine energy wet-mate connection system | Innovate UK | £113,954 |
Sept. 30, 2020 | Dec. 31, 2020 | Closed |
17 | Marine energy wet-mate connection system | Innovate UK | £284,885 |
Sept. 30, 2020 | Dec. 31, 2020 | Closed |
18 | Development of in situ repair of damaged wind turbine blades | Innovate UK | £241,392 |
May 31, 2010 | Nov. 30, 2011 | Closed |
19 | Development of in situ repair of damaged wind turbine blades | Innovate UK | £603,480 |
May 31, 2010 | Nov. 30, 2011 | Closed |
20 | O&M Optimisation for the X-Rotor Wind Turbine Concept | EPSRC | £0 |
Sept. 30, 2019 | Sept. 29, 2023 | Active |