# Title Funder Funding Start End Status
1 Hybrid Lightweight Structural Systems for Low-Cost Housing (HYLIGHTS) EPSRC
£377,742
Aug. 31, 2022 Feb. 28, 2025 Active
2 HYBRID LIGHTWEIGHT STRUCTURAL SYSTEMS FOR LOW-COST HOUSING (HYLIGHTS) EPSRC
£442,259
Aug. 31, 2022 Feb. 28, 2025 Active
3 HYBRID LIGHTWEIGHT STRUCTURAL SYSTEMS FOR LOW-COST HOUSING (HYLIGHTS) EPSRC
£285,475
Aug. 31, 2022 Feb. 28, 2025 Active
4 Buildings of 2050: What can be achieved with zero-carbon structures? EPSRC
£0
March 27, 2022 Sept. 29, 2025 Active
5 Buildings of 2050: What can be achieved with zero-carbon structures? EPSRC
£0
March 31, 2022 Sept. 30, 2025 Active
6 SHUTTERING: Low carbon concrete Structures witH aUxeTic TextilE foRmworks as reinforcING element EPSRC
£2,958,922
May 31, 2022 Aug. 30, 2025 Active
7 Product Based Building Solutions - High Productivity Digital Integrated Assured DfMA for Lifecycle Performance Innovate UK
£3,948,858
March 31, 2020 June 29, 2022 Active
8 Knitting bespoke reinforcement for new concrete structures EPSRC
£482,632
March 29, 2015 June 28, 2017 Closed
9 Engineered UK clays for production of low-carbon cements EPSRC
£165,356
June 30, 2022 June 29, 2026 Active
10 Engineered UK clays for production of low-carbon cements EPSRC
£997,934
June 30, 2022 June 29, 2026 Active
11 Engineered UK clays for production of low-carbon cements EPSRC
£857,130
June 30, 2022 June 29, 2026 Active
12 Decarbonising Precast Concrete Manufacturing Innovate UK
£1,772,845
April 30, 2021 June 30, 2022 Closed
13 Cement 2 Zero Innovate UK
£30,000
Feb. 1, 2022 March 30, 2022 Closed
14 Structural behaviour of geopolymer concrete reinforced with basalt FRP bars EPSRC
£0
Jan. 9, 2017 July 6, 2021 Closed
15 Recycling of FRP wind blade waste material in concrete EPSRC
£0
Sept. 27, 2020 Jan. 31, 2025 Active
16 Recycling of FRP wind blade waste material in concrete EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
17 Graphene Enhanced Concrete for a Resilient Recovery Innovate UK
£757,242
March 31, 2021 March 30, 2022 Closed
18 LOCOWAG - low carbon concrete for use within aggressive ground Innovate UK
£776,248
Nov. 1, 2020 Oct. 31, 2022 Active
19 SUSTAIN Manufacturing Hub EPSRC
£21,321,975
March 31, 2019 March 30, 2026 Active
20 SUSTAIN Manufacturing Hub EPSRC
£54,264,940
March 31, 2019 Sept. 30, 2026 Active
Reset