Home Projects More like: Development of a new integrated approach for Structural health monitoring and lifecycle management of offshore wind turbine foundations and transition pieces. (Acronym: Pile-Monitor) [Clear] # Title Funder Funding Start End Status 81 Friction Joining - Low Energy Manufacturing for Hybrid Structures in Fuel Efficient Transport Applications EPSRC £366,632 March 31, 2009 Sept. 29, 2012 Closed 82 Friction Joining - Low Energy Manufacturing for Hybrid Structures in Fuel Efficient Transport Applications EPSRC £2,032,200 June 30, 2009 Sept. 30, 2012 Closed 83 Enabling Astronomy with Gravitational Waves STFC £435,956 Sept. 30, 2008 Sept. 29, 2011 Closed 84 Enabling Astronomy with Gravitational Waves STFC £1,089,890 Sept. 30, 2008 Sept. 30, 2011 Closed 85 CMMI-EPSRC: Quantitative Characterization of Mission Critical Microstructures of Engineering Metals with Diffusive Ultrasound EPSRC £3,052,775 Aug. 28, 2022 Aug. 28, 2025 Active 86 Ultrasonic prevention and removal of biofouling from marine electricity generators Innovate UK £1,109,130 March 1, 2014 March 30, 2016 Closed 87 Modelling Creep and Creep-Fatigue Damage for CSEF Power Plant Steels EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 88 Fundamentals of static crack growth in nickel-based superalloys after friction welding EPSRC £0 June 30, 2021 March 30, 2022 Active 89 Bio-fouling self-cleaning condition monitoring system for offshore wind turbine foundations (BIOclean-CMS) Innovate UK £179,916 July 31, 2013 Oct. 31, 2014 Closed 90 Bio-fouling self-cleaning condition monitoring system for offshore wind turbine foundations (BIOclean-CMS) Innovate UK £449,790 July 31, 2013 Oct. 31, 2014 Closed 91 Offshore Wind Foundation Diagnostic Monitoring System (OFDiMoS) Innovate UK £126,338 March 31, 2022 Sept. 29, 2023 Active 92 Offshore Wind Foundation Diagnostic Monitoring System (OFDiMoS) Innovate UK £631,690 March 31, 2022 Sept. 30, 2023 Closed 93 Geometric Mechanics of Solids: new analysis of modern engineering materials EPSRC £2,681,810 Feb. 1, 2017 Sept. 29, 2022 Active 94 Development of a standardised marine mammal monitoring system for the tidal energy industry NERC £707,492 Jan. 1, 2018 Dec. 31, 2021 Closed 95 Development of a standardised marine mammal monitoring system for the tidal energy industry NERC £1,768,730 Jan. 1, 2018 Dec. 31, 2021 Closed 96 DMW-Creep: Influence of Inhomogeneity on Creep of Dissimilar Metal Welds EPSRC £3,689,845 March 1, 2013 Feb. 28, 2017 Closed 97 Integrated wind-wave control of semi-submersible floating offshore wind turbine platforms (FOWT-Control) EPSRC £1,922,605 June 30, 2023 June 30, 2026 Active 98 Long Term, In Situ Material Degradation Studies Utilizing High Resolution Laboratory X-ray Tomography EPSRC £202,046 March 11, 2010 March 10, 2012 Closed 99 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 25, 2019 March 30, 2023 Active 100 Integrating with Renewable Energy sources: Low Pressure Steam Turbine Last Stage Blade Durability EPSRC £0 Sept. 30, 2019 March 31, 2023 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »