Home Projects More like: Decentralised Ammonia production from Renewable Energy utilising novel sorption-enhanced plasma-catalytic Power-to-X technology [Clear] # Title Funder Funding Start End Status 41 Intensified Integrated Bio-Refinery EPSRC £28,424 May 31, 2006 May 30, 2008 Closed 42 Intensified Integrated Bio-Refinery EPSRC £239,878 April 30, 2007 Dec. 31, 2008 Closed 43 Intensified Integrated Bio-Refinery EPSRC £588,765 Oct. 15, 2006 April 15, 2008 Closed 44 Intensified Integrated Bio-Refinery EPSRC £71,060 May 31, 2006 May 31, 2008 Closed 45 Intensified Integrated Bio-Refinery EPSRC £599,695 April 30, 2007 Dec. 31, 2008 Closed 46 Intensified Integrated Bio-Refinery EPSRC £787,790 Jan. 29, 2007 Jan. 28, 2009 Closed 47 Intensified Integrated Bio-Refinery EPSRC £481,295 Oct. 1, 2006 March 1, 2008 Closed 48 EPSRC Capital Award for Core Equipment 2020/21 EPSRC £2,179,000 Nov. 9, 2020 May 7, 2022 Closed 49 Novel solid acid materials based on polyoxometalates EPSRC £198,346 Dec. 20, 2007 June 18, 2011 Closed 50 Capture and reduction of carbon emissions to maximise circularity in the steelmaking process EPSRC £0 Sept. 30, 2022 Sept. 29, 2026 Active 51 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC £240,882 Oct. 16, 2022 Oct. 15, 2023 Active 52 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC £1,204,410 Oct. 16, 2022 Nov. 16, 2023 Closed 53 New Approach to Extend Durability of Sorbent Powders for Multicycle High Temperature CO2 Capture in Hydrogen EPSRC £837,720 Nov. 1, 2012 Oct. 31, 2014 Closed 54 A Multidisciplinary Research Centre for Advanced Electron Paramagnetic Resonance EPSRC £6,650,588 Aug. 31, 2006 Feb. 29, 2012 Closed 55 A Multidisciplinary Research Centre for Advanced Electron Paramagnetic Resonance EPSRC £16,626,470 Aug. 31, 2006 Feb. 29, 2012 Closed 56 Electrolysis at scale: a pathway to lower precious metal content electrolysers EPSRC £391,366 Jan. 1, 2023 Dec. 31, 2025 Active 57 Flexible Routes to Liquid Fuels from CO2 by Advanced Catalysis and Engineering EPSRC £3,608,530 March 30, 2016 Sept. 29, 2020 Closed 58 Flexible Routes to Liquid Fuels from CO2 by Advanced Catalysis and Engineering EPSRC £9,021,325 March 30, 2016 Sept. 30, 2020 Closed 59 A paradigm shift in nitrogen activation for green ammonia synthesis EPSRC £1,003,080 March 20, 2023 Sept. 19, 2024 Active 60 A paradigm shift in nitrogen activation for green ammonia synthesis EPSRC £200,616 Sept. 30, 2022 March 31, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »