More like:
CR-VAWT [Clear]

# Title Funder Funding Start End Status
1 Use of Endwall Contouring to Improve the Efficiency of Gas Turbines EPSRC
£0
June 30, 2019 Sept. 29, 2023 Active
2 Gas-Turbine and Governor Modelling and Benefits of Integrated Control of Embedded Generation Plant EPSRC
£331,964
March 31, 2006 March 30, 2009 Closed
3 Gas Turbine Inlet Cooling upstream Air Filtration System Innovate UK
£54,000
Sept. 30, 2011 Jan. 31, 2012 Closed
4 ALL-TTidal: Arrays of Long Life Turbines for Tidal EPSRC
£245,256
Sept. 30, 2014 June 29, 2015 Closed
5 Development of a High Efficiency Axial Inflow Turbine for Application on a Downsized Gasoline Engine EPSRC
£0
Sept. 30, 2018 Sept. 29, 2021 Closed
6 MFB4WTG Innovate UK
£166,350
Nov. 1, 2019 May 30, 2021 Closed
7 Strategies for reducing cost of Engineering Optimisation EPSRC
£0
Sept. 30, 2019 March 30, 2023 Active
8 Strategies for reducing cost of Engineering Optimisation EPSRC
£0
Sept. 30, 2019 March 31, 2023 Closed
9 Dynamic Loadings on Turbines in a Tidal Array (DyLoTTA) EPSRC
£1,607,090
June 30, 2016 March 30, 2020 Closed
10 Development of in situ repair of damaged wind turbine blades Innovate UK
£241,392
May 31, 2010 Nov. 30, 2011 Closed
11 Development of in situ repair of damaged wind turbine blades Innovate UK
£603,480
May 31, 2010 Nov. 30, 2011 Closed
12 Experimental measurements of the effect of hot gas ingestion on rotor discs EPSRC
£199,372
Jan. 2, 2014 Jan. 1, 2016 Closed
13 CFD Study of Wind Turbine Aerodynamics EPSRC
£0
Sept. 30, 2017 Nov. 24, 2020 Closed
14 Integration of Wind Power Generation with Compressed Air Energy Storage 1=Energy 2=Wind Power EPSRC
£0
Sept. 30, 2018 June 29, 2022 Active
15 Integration of Wind Power Generation with Compressed Air Energy Storage 1=Energy 2=Wind Power EPSRC, NERC
£0
Sept. 30, 2018 June 30, 2022 Closed
16 Novel Turbine Blade Design Innovate UK
£10,000
July 31, 2014 Jan. 31, 2015 Closed
17 Evance 15kW Ultra Low Noise Wind Turbine Innovate UK
£200,000
Jan. 1, 2012 Dec. 31, 2012 Closed
18 Evance 15kW Ultra Low Noise Wind Turbine Innovate UK, NERC
£500,000
Jan. 1, 2012 Dec. 31, 2012 Closed
19 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
20 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
Reset