Home Projects More like: MFB4WTG [Clear] # Title Funder Funding Start End Status 21 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 22 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC £338,246 May 28, 2019 Dec. 31, 2021 Closed 23 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC £845,615 May 28, 2019 Dec. 31, 2021 Closed 24 Localisation and Navigation of a robot on an offshore wind turbine blade using intelligent algorithms Innovate UK £394,641 Sept. 30, 2022 Sept. 29, 2023 Active 25 Localisation and Navigation of a robot on an offshore wind turbine blade using intelligent algorithms Innovate UK £1,973,205 Sept. 30, 2022 Sept. 30, 2023 Closed 26 Thrust-vectoring Drone Delivery and Remote Operation of a Wind Turbine Blade Autonomous Repair Manipulator (VECTARM) Innovate UK £49,997 Nov. 1, 2022 April 29, 2023 Active 27 In situ blade inspection, cleaning and repair for offshore wind turbines using suspended work platforms Innovate UK £221,262 May 31, 2013 May 30, 2014 Closed 28 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 29, 2024 Active 29 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 30, 2024 Active 30 Investigation of the causes for wind turbine underperformance and increased failure rates EPSRC, NERC £0 Sept. 30, 2018 Nov. 30, 2022 Closed 31 Non contact microphone array for structural health diagnostics combined with active noise and vibration cancellation for wind turbine nacelle machinery (CMDRIVE) Innovate UK £349,122 March 1, 2014 Feb. 28, 2015 Closed 32 Non contact microphone array for structural health diagnostics combined with active noise and vibration cancellation for wind turbine nacelle machinery (CMDRIVE) Innovate UK £872,805 March 1, 2014 Feb. 28, 2015 Closed 33 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £2,953,388 Nov. 2, 2015 April 30, 2019 Closed 34 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC £7,383,470 Nov. 2, 2015 May 1, 2019 Closed 35 FLoating Offshore wind REpair & Novel Concept cost Estimates (FLORENCE) EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 36 Development of in situ repair of damaged wind turbine blades Innovate UK £241,392 May 31, 2010 Nov. 30, 2011 Closed 37 Development of in situ repair of damaged wind turbine blades Innovate UK £603,480 May 31, 2010 Nov. 30, 2011 Closed 38 Romain – Development of a robotic maintenance system for wind turbine blades Innovate UK £41,946 Jan. 1, 2022 March 30, 2022 Closed 39 Romain – Development of a robotic maintenance system for wind turbine blades Innovate UK £104,865 Jan. 1, 2022 March 31, 2022 Closed 40 In-service X-ray radiography of offshore wind blades (RADBLAD) Innovate UK £1,540,542 March 31, 2019 June 29, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »