More like:
MFB4WTG [Clear]

# Title Funder Funding Start End Status
21 Developing liquid acrylic resin-based composites for marine renewable energy and ship building applications EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
22 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC
£338,246
May 28, 2019 Dec. 31, 2021 Closed
23 Development and demonstration of methods and tools for large scale wind turbine pitch bearing condition assessment (DemoBearing) EPSRC
£845,615
May 28, 2019 Dec. 31, 2021 Closed
24 Localisation and Navigation of a robot on an offshore wind turbine blade using intelligent algorithms Innovate UK
£1,973,205
Sept. 30, 2022 Sept. 30, 2023 Closed
25 Localisation and Navigation of a robot on an offshore wind turbine blade using intelligent algorithms Innovate UK
£394,641
Sept. 30, 2022 Sept. 29, 2023 Active
26 Thrust-vectoring Drone Delivery and Remote Operation of a Wind Turbine Blade Autonomous Repair Manipulator (VECTARM) Innovate UK
£49,997
Nov. 1, 2022 April 29, 2023 Active
27 In situ blade inspection, cleaning and repair for offshore wind turbines using suspended work platforms Innovate UK
£221,262
May 31, 2013 May 30, 2014 Closed
28 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC
£0
April 30, 2020 April 29, 2024 Active
29 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC
£0
April 30, 2020 April 30, 2024 Active
30 Investigation of the causes for wind turbine underperformance and increased failure rates EPSRC, NERC
£0
Sept. 30, 2018 Nov. 30, 2022 Closed
31 Non contact microphone array for structural health diagnostics combined with active noise and vibration cancellation for wind turbine nacelle machinery (CMDRIVE) Innovate UK
£349,122
March 1, 2014 Feb. 28, 2015 Closed
32 Non contact microphone array for structural health diagnostics combined with active noise and vibration cancellation for wind turbine nacelle machinery (CMDRIVE) Innovate UK
£872,805
March 1, 2014 Feb. 28, 2015 Closed
33 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£2,953,388
Nov. 2, 2015 April 30, 2019 Closed
34 MAXFARM (MAXimizing wind Farm Aerodynamic Resource via advanced Modelling) EPSRC
£7,383,470
Nov. 2, 2015 May 1, 2019 Closed
35 FLoating Offshore wind REpair & Novel Concept cost Estimates (FLORENCE) EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
36 Development of in situ repair of damaged wind turbine blades Innovate UK
£241,392
May 31, 2010 Nov. 30, 2011 Closed
37 Development of in situ repair of damaged wind turbine blades Innovate UK
£603,480
May 31, 2010 Nov. 30, 2011 Closed
38 Romain – Development of a robotic maintenance system for wind turbine blades Innovate UK
£41,946
Jan. 1, 2022 March 30, 2022 Closed
39 Romain – Development of a robotic maintenance system for wind turbine blades Innovate UK
£104,865
Jan. 1, 2022 March 31, 2022 Closed
40 In-service X-ray radiography of offshore wind blades (RADBLAD) Innovate UK
£1,540,542
March 31, 2019 June 29, 2021 Closed
Reset