Home Projects More like: EPSRC Centre for Doctoral Training in Ultra Precision [Clear] # Title Funder Funding Start End Status 1 Cambridge & Cranfield Doctoral Training Centre in Ultra Precision EPSRC £12,833,960 Sept. 30, 2012 March 31, 2019 Closed 2 Multidisciplinary Research Equipment Investment: Coherence Scanning Interferometer (CSI) and Vector Network Analyser (VNA) EPSRC £300,000 Feb. 13, 2020 Aug. 11, 2021 Closed 3 Multidisciplinary Research Equipment Investment: Coherence Scanning Interferometer (CSI) and Vector Network Analyser (VNA) EPSRC £750,000 Feb. 13, 2020 Aug. 12, 2021 Closed 4 EPSRC Centre for Innovative Manufacturing in Food EPSRC £9,002,098 Dec. 1, 2013 Feb. 28, 2019 Closed 5 EPSRC Centre for Innovative Manufacturing in Food EPSRC £22,505,245 Dec. 1, 2013 Feb. 28, 2019 Closed 6 On-line surface inspection of roll-to-roll film processing EPSRC £187,336 April 30, 2013 Oct. 31, 2014 Closed 7 On-line surface inspection of roll-to-roll film processing EPSRC £468,340 April 30, 2013 Oct. 31, 2014 Closed 8 EPSRC and SFI Centre for Doctoral Training in Advanced Metallic Systems: Metallurgical Challenges for the Digital Manufacturing Environment EPSRC £10,909,005 Sept. 30, 2019 March 30, 2028 Active 9 Next Generation Manufacturing of 3D Active Surface Coatings EPSRC £411,144 Aug. 31, 2015 Oct. 16, 2016 Closed 10 Next Generation Manufacturing of 3D Active Surface Coatings EPSRC £222,088 Jan. 17, 2017 July 30, 2018 Closed 11 EDT MATTER - Manufacturing Advances Through Training Engineering Researchers EPSRC £2,496,000 Sept. 30, 2011 Sept. 29, 2018 Closed 12 SUSTAIN Manufacturing Hub EPSRC £21,321,975 March 31, 2019 March 30, 2026 Active 13 SUSTAIN Manufacturing Hub EPSRC £54,264,940 March 31, 2019 Sept. 30, 2026 Active 14 Development of efficient and scalable ultrasound-assisted solidification technologies for manufacturing advanced metallic alloys (Ultra-Cast) EPSRC £617,474 Aug. 31, 2014 Nov. 21, 2017 Closed 15 Application Targeted and Integrated Photovoltaics - Enhancing UK Capability in Solar EPSRC £11,983,474 June 30, 2020 June 29, 2025 Active 16 Application Targeted and Integrated Photovoltaics - Enhancing UK Capability in Solar EPSRC £29,958,685 June 30, 2020 June 30, 2025 Active 17 THE FUTURE COMPOSITES MANUFACTURING HUB EPSRC £54,153,955 Jan. 1, 2017 June 30, 2024 Active 18 Future Biomanufacturing Research Hub EPSRC £20,952,824 March 31, 2019 March 30, 2026 Active 19 Future Biomanufacturing Research Hub EPSRC £53,341,575 March 31, 2019 March 31, 2026 Active 20 Future Electrical Machines Manufacturing Hub EPSRC £21,191,706 March 31, 2019 March 30, 2026 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 »