Home Projects More like: Modelling surface effects in two-phase fluid processes across scales [Clear] # Title Funder Funding Start End Status 41 Linking Microstructure to Neutron Irradiation Defects in Advanced Manufacture of Steels EPSRC £3,325,150 Dec. 1, 2016 Nov. 30, 2020 Closed 42 New Nuclear Manufacturing (NNUMAN) EPSRC £8,230,954 Sept. 30, 2012 March 30, 2018 Closed 43 New Nuclear Manufacturing (NNUMAN) EPSRC £20,577,385 Sept. 30, 2012 March 31, 2018 Closed 44 Stochastic analysis of the neutron transport equation and applications to nuclear safety EPSRC £2,211,305 May 15, 2017 Dec. 31, 2021 Closed 45 Validation & Verification for Critical Heat Flux and CFD EPSRC £1,037,475 Aug. 31, 2011 May 31, 2015 Closed 46 Realising the Commercial Potential of the Multi-Physics and Multi-Scale FETCH Technology for Nuclear Safety Applications EPSRC £529,605 Aug. 31, 2010 Aug. 31, 2011 Closed 47 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £982,574 March 17, 2016 March 16, 2020 Closed 48 From Processing to Simulated In-Reactor Performance of Zr Cladding. EPSRC £2,456,435 March 17, 2016 March 16, 2020 Closed 49 Innovative LWR Simulation Tool for the Nuclear Renaissance in the UK EPSRC £1,220,675 June 30, 2018 June 30, 2021 Closed 50 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC £628,950 June 30, 2022 June 29, 2025 Active 51 Intermetallic Dispersion Strengthened 'IDS-Steels' for Generation IV Nuclear EPSRC £3,144,750 June 30, 2022 June 30, 2025 Active 52 Reducing uncertainty in predicting the risk of geological storage of CO2 - Improved geomechanical models and calibration using seismic data EPSRC £2,026,294 Sept. 30, 2013 Sept. 29, 2018 Closed 53 Reducing uncertainty in predicting the risk of geological storage of CO2 - Improved geomechanical models and calibration using seismic data EPSRC £5,065,735 Sept. 30, 2013 Sept. 30, 2018 Closed 54 Generalised high-order Eulerian Smoothed Particle Hydrodynamics for internal flows applied to flow-induced vibration and nuclear tube banks EPSRC £1,382,414 Nov. 1, 2017 July 30, 2021 Closed 55 Investigation of the safe removal of fuel debris: multi-physics simulation EPSRC £2,520,115 Nov. 1, 2016 Sept. 30, 2019 Closed 56 Computational Modelling and Optimisation of Carbon Capture Reactors EPSRC £2,904,795 Jan. 30, 2013 Sept. 11, 2015 Closed 57 Computational Modelling and Optimisation of Carbon Capture Reactors EPSRC £1,135,455 Sept. 11, 2015 Nov. 11, 2017 Closed 58 High Performance, Deterministic, Radiation Transport Methods for Radiation Shielding Analyses of Small Modular Reactors EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 59 The Post-Disposal Behaviour of C-14 and Irradiated Graphite EPSRC £3,642,065 Nov. 1, 2011 Oct. 31, 2015 Closed 60 Mechanisms of Retention and Transport of Fission Products in Virgin and Irradiated Nuclear Graphite EPSRC £1,599,610 March 1, 2018 Sept. 30, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »