Home Projects More like: Sustainability and Proliferation Resistance Assessment of Open Cycle Thorium-Fuelled Nuclear Energy [Clear] # Title Funder Funding Start End Status 61 Development of a High Flux Accelerator-Driven Neutron Irradiation Facility for Nuclear Plant Materials and Applied Neutron Science EPSRC £43,848,865 Nov. 1, 2019 March 31, 2024 Active 62 Innovation in the Design of Improved Actinide Selective Extractants Suitable for use in Large Scale Spent Nuclear Fuel Reprocessing EPSRC £503,515 Feb. 27, 2017 June 26, 2018 Closed 63 Understanding the In-Reactor Performance of Advanced Ceramic Cladding Materials EPSRC £1,222,990 June 30, 2015 Aug. 31, 2018 Closed 64 UNIGRAF: Understanding and Improving Graphite for Nuclear Fission EPSRC £2,437,695 Aug. 23, 2015 Feb. 23, 2019 Closed 65 Imaging and location of fast neutron emissions by real-time time-of-flight EPSRC £1,061,834 Dec. 10, 2015 March 9, 2020 Closed 66 Imaging and location of fast neutron emissions by real-time time-of-flight EPSRC £2,654,585 Dec. 10, 2015 March 9, 2020 Closed 67 Understanding the mechanisms controlling low potential stress corrosion cracking in nuclear reactors EPSRC £7,063,555 Dec. 1, 2017 May 31, 2022 Closed 68 REFINE: A coordinated materials programme for the sustainable REduction of spent Fuel vital In a closed loop Nuclear Energy cycle EPSRC £2,199,028 Sept. 30, 2011 March 30, 2016 Closed 69 REFINE: A coordinated materials programme for the sustainable REduction of spent Fuel vital In a closed loop Nuclear Energy cycle EPSRC £5,497,570 Sept. 30, 2011 March 31, 2016 Closed 70 High performance deterministic radiation transport methods for SMRs EPSRC £0 Sept. 30, 2022 Sept. 30, 2026 Active 71 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC £1,086,628 Jan. 1, 2020 Dec. 31, 2023 Active 72 Simultaneous Corrosion/Irradiation Testing in Lead and Lead-Bismuth Eutectic: The Radiation Decelerated Corrosion Hypothesis (RC-3) EPSRC £2,716,570 Jan. 1, 2020 Sept. 30, 2024 Active 73 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £265,188 Aug. 28, 2014 May 30, 2018 Closed 74 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £1,276,114 Aug. 28, 2014 March 31, 2019 Closed 75 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £620,288 Aug. 28, 2014 March 31, 2019 Closed 76 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £3,190,285 Aug. 28, 2014 March 31, 2019 Closed 77 Beyond biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £1,550,720 Aug. 28, 2014 March 31, 2019 Closed 78 Beyond Biorecovery: environmental win-win by biorefining of metallic wastes into new functional materials (B3) NERC £662,970 Aug. 28, 2014 May 31, 2018 Closed 79 SiC fuel cladding: Macroscopic effects of radiation on mechanical and thermal properties from microstructural-scale characterisation and modelling EPSRC £2,367,410 Dec. 1, 2015 May 31, 2019 Closed 80 Salt-cooled High-temperature Reactors EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »