Home Projects More like: Reactor core-structure re-location modelling for severe nuclear accidents [Clear] # Title Funder Funding Start End Status 41 Constraining projections of ice sheet instabilities and future sea level rise FLF £6,253,685 April 30, 2019 April 30, 2024 Active 42 Enhancing nuclear fuel efficiency through improved understanding of irradiation damage in zirconium cladding EPSRC £7,500,055 Jan. 1, 2011 March 31, 2017 Closed 43 SiC fuel cladding: Macroscopic effects of radiation on mechanical and thermal properties from microstructural-scale characterisation and modelling EPSRC £2,367,410 Dec. 1, 2015 May 31, 2019 Closed 44 Optimising Plasma Sprayed Tungsten Coatings EPSRC, NERC £0 Sept. 30, 2018 March 31, 2023 Closed 45 AGR Technologies for Enabling Molten Salt-cooled Reactor Designs EPSRC £1,640,640 Aug. 31, 2018 Nov. 30, 2021 Closed 46 Fracture of Graphite Fuel Bricks EPSRC £2,067,375 May 31, 2013 Nov. 30, 2015 Closed 47 Design and Maintenance of Nuclear Safety Systems for Life Extension (DaMSSLE) EPSRC £2,789,650 Dec. 1, 2015 Nov. 30, 2019 Closed 48 Stochastic analysis of the neutron transport equation and applications to nuclear safety EPSRC £2,211,305 May 15, 2017 Dec. 31, 2021 Closed 49 NEC06110 RED FIRE: Radioactive Environment Damaged by fire: a Forest In REcovery NERC £261,970 Nov. 9, 2016 Nov. 8, 2017 Closed 50 Novel restoration materials for clean-up of radionuclides in the environment EPSRC £1,285,970 Nov. 1, 2014 March 31, 2017 Closed 51 Integration of calcium signalling mechanisms in neural modelling BBSRC £514,446 March 1, 2011 Feb. 28, 2014 Closed 52 Stress jump boundary condition capturing for the lattice Boltzmann simulation methods EPSRC £164,138 Nov. 3, 2014 May 1, 2017 Closed 53 Validation & Verification for Critical Heat Flux and CFD EPSRC £1,037,475 Aug. 31, 2011 May 31, 2015 Closed 54 High Reliability Interconnects: New Methodologies for Lead-free Solders EPSRC £3,899,139 June 30, 2018 June 29, 2022 Closed 55 ISCF Wave 1: Improved lifetime performance and safety of electrochemical energy stores through functionalization of passive materials and components EPSRC £2,006,842 Sept. 30, 2017 May 30, 2021 Closed 56 ISCF Wave 1: Improved lifetime performance and safety of electrochemical energy stores through functionalization of passive materials and components UUI £5,017,105 Sept. 30, 2017 May 31, 2021 Closed 57 Predictive Modelling for Nuclear Engineering EPSRC £3,310,750 Jan. 1, 2016 June 18, 2017 Closed 58 Predictive Modelling for Nuclear Engineering EPSRC £2,320,805 June 18, 2017 Dec. 18, 2022 Closed 59 MAINTAiN - Multi-scAle INTegrity assessment for Advanced high-temperature Nuclear systems EPSRC £1,970,165 March 31, 2018 Sept. 30, 2022 Closed 60 MIDAS - Mechanistic understanding of Irradiation Damage in fuel Assemblies EPSRC £36,133,275 April 30, 2019 April 30, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 »