# Title Funder Funding Start End Status
21 Structural behaviour of geopolymer concrete reinforced with basalt FRP bars EPSRC
£0
Jan. 9, 2017 July 6, 2021 Closed
22 Engineering bacteria for industrially extreme conditions EPSRC
£0
Sept. 30, 2017 Dec. 31, 2021 Closed
23 Biogenic metal phosphates: Low cost, high capacity, stable 'lockups' for the removal of radionuclides from groundwater and decontamination solutions NERC
£699,230
March 31, 2014 June 30, 2015 Closed
24 Multivariate Max-stable Processes with Application to the Forecasting of Multiple Hazards EPSRC
£878,108
June 28, 2018 Aug. 30, 2021 Closed
25 Multivariate Max-stable Processes with Application to the Forecasting of Multiple Hazards EPSRC
£85,630
Aug. 31, 2021 July 30, 2022 Closed
26 Development of microstructural simulation tools for fusion materials EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
27 Development of microstructural simulation tools for fusion materials EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
28 Nuclear Physics Rolling Grant STFC
£6,961,825
July 31, 2008 Aug. 1, 2011 Closed
29 Nuclear Structure, Astrophysics and Reactions (NuSTAR) at FAIR STFC
£7,975,025
Feb. 24, 2010 March 31, 2016 Closed
30 Robotics and Artificial Intelligence for Nuclear (RAIN) ISCF
£64,039,555
Oct. 1, 2017 March 31, 2022 Closed
31 Survivability of Floating Offshore Wind Turbines using CFD EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
32 EXTREME WAVE LOADING ON OFFSHORE WAVE ENERGY DEVICES USING CFD: A HIERARCHICAL TEAM APPROACH EPSRC
£448,180
Sept. 30, 2006 Dec. 31, 2007 Closed
33 EXTREME WAVE LOADING ON OFFSHORE WAVE ENERGY DEVICES USING CFD: A HIERARCHICAL TEAM APPROACH EPSRC
£0
Jan. 1, 2008 Sept. 30, 2009 Closed
34 EXTREME WAVE LOADING ON OFFSHORE WAVE ENERGY DEVICES USING CFD: A HIERARCHICAL TEAM APPROACH EPSRC
£448,860
Sept. 30, 2006 Sept. 30, 2009 Closed
35 EXTREME WAVE LOADING ON OFFSHORE WAVE ENERGY DEVICES USING CFD: A HIERARCHICAL TEAM APPROACH EPSRC
£582,645
Feb. 1, 2007 Jan. 31, 2010 Closed
36 Ceramic Coatings for Clad (The C^3 Project): Advanced Accident-Tolerant Ceramic Coatings for Zr-alloy Cladding EPSRC
£5,375,720
June 23, 2013 Sept. 14, 2015 Closed
37 Ceramic Coatings for Clad (The C^3 Project): Advanced Accident-Tolerant Ceramic Coatings for Zr-alloy Cladding EPSRC
£1,744,120
Dec. 15, 2015 Sept. 1, 2017 Closed
38 A low-cost computer cluster for the calculation of atomic data of importance in plasma physics EPSRC
£161,005
March 1, 2010 Feb. 29, 2012 Closed
39 Addressing self-irradiation damage and its impact on the long-term behaviour of nuclear waste matrices EPSRC
£2,111,548
March 31, 2020 March 31, 2024 Active
40 Addressing self-irradiation damage and its impact on the long-term behaviour of nuclear waste matrices EPSRC
£5,278,870
March 31, 2020 March 31, 2024 Active
Reset