# Title Funder Funding Start End Status
21 The Plasma-CCP Network EPSRC
£629,975
June 30, 2015 July 30, 2021 Closed
22 Turbulence and transport in the presence of electromagnetic fluctuations and supra-thermal particles in tokamaks. EPSRC
£1,827,355
March 31, 2023 March 31, 2026 Active
23 Understanding radiation damage mechanisms in high temperature superconductors for fusion applications EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
24 Understanding and modelling kinetic turbulence in magnetized plasmas EPSRC
£451,485
May 31, 2017 May 31, 2019 Closed
25 USING MICROWAVE BACK-SCATTERING TO DETERMINE THE STABILITY OF THE TOKAMAK PLASMA EDGE EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
26 EPSRC Centre for Doctoral Training in the Science and Technology of Fusion Energy EPSRC
£19,028,215
March 31, 2014 Sept. 30, 2023 Closed
27 The influence of magnetic geometry on the plasma edge region of future fusion reactors EPSRC
£1,589,624
Sept. 30, 2016 Sept. 29, 2021 Closed
28 The influence of magnetic geometry on the plasma edge region of future fusion reactors EPSRC
£3,974,060
Sept. 30, 2016 Sept. 30, 2021 Closed
29 Next Generation metasurfaces: tensorial surfaces for novel antenna functionality EPSRC
£0
Sept. 30, 2021 Sept. 30, 2025 Active
30 High-Field Superconductors under Strain that Enable Spherical Tokamaks for Fusion Power Generation (Experimental PhD). EPSRC
£0
Sept. 30, 2022 Sept. 30, 2026 Active
31 Electron heat transport in tokamak edge pedestals EPSRC
£0
Sept. 30, 2022 March 30, 2026 Active
32 G8 Multilateral Research Funding Nu-FuSE EPSRC
£1,976,510
April 3, 2011 Sept. 30, 2014 Closed
33 Cross-field Transport in Magnetized Plasmas EPSRC, NERC
£0
Sept. 30, 2018 June 30, 2023 Closed
34 Statistical Monitoring and Control of Nuclear Fusion Systems. EPSRC
£0
Sept. 30, 2019 March 31, 2024 Active
35 CCP Flagship: A radiation-hydrodynamics code for the UK laser-plasma community EPSRC
£596,042
March 30, 2015 March 29, 2018 Closed
36 CCP Flagship: A radiation-hydrodynamics code for the UK laser-plasma community EPSRC
£1,490,105
March 30, 2015 March 30, 2018 Closed
37 AWAKE-Run 2 STFC
£227,982
March 31, 2020 March 30, 2023 Active
38 Production of high quality electron bunches in AWAKE Run 2 STFC
£655,960
March 31, 2020 March 30, 2023 Active
39 Production of high quality electron bunches in AWAKE Run 2 STFC
£572,566
March 31, 2020 March 30, 2023 Active
40 Production of high quality electron bunches in AWAKE Run 2 STFC
£1,027,852
March 31, 2020 March 30, 2023 Active
Reset