Home Projects More like: Feasibility study for applications of nowlight in BOP markets [Clear] # Title Funder Funding Start End Status 81 How does low-temperature plasma damage the bacterial outer membrane? BBSRC £0 Sept. 30, 2018 Dec. 31, 2022 Active 82 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC £201,454 March 21, 2017 May 23, 2018 Closed 83 Power flow control in future electric vehicles and dc microgrids with multiple energy sources EPSRC £503,635 March 21, 2017 May 24, 2018 Closed 84 Digital and physical incremental renovation packages/systems enhancing environmental and energetic behaviour and use of resources Horizon Europe Guarantee £1,897,920 Jan. 1, 2023 Dec. 31, 2026 Active 85 Transforming Islands in Sustainable Circular Energy Resource Hubs EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 86 Transforming Islands in Sustainable Circular Energy Resource Hubs EPSRC £0 Sept. 30, 2019 May 18, 2024 Active 87 Evaluation of the health impacts of aircraft nanoparticles using a surrogate soot source and in vitro cell exposure EPSRC £0 Oct. 2, 2020 Oct. 1, 2024 Active 88 Real Time Digital Twins for Structural Health Diagnostics EPSRC £0 Sept. 30, 2020 Sept. 30, 2023 Closed 89 Quantum fluctuations during cosmic inflation STFC £0 Sept. 30, 2018 Sept. 29, 2022 Active 90 Quantum fluctuations during cosmic inflation STFC £0 Sept. 30, 2018 Sept. 30, 2022 Closed 91 Development of Strategic Data-Driven Approaches To Sustainable Bioprocess Modelling and Optimisation EPSRC £0 Aug. 31, 2019 Sept. 29, 2022 Active 92 Flexible Electrochromic Devices from Self-Assembled Organic Molecules EPSRC £0 Sept. 30, 2018 June 30, 2022 Active 93 High performance Solar Cell Fabrication (SolarFAB) Innovate UK £1,413,830 Aug. 31, 2011 June 30, 2015 Closed 94 Life Transitions and Travel Behaviour ESRC £305,380 Nov. 1, 2012 April 29, 2014 Closed 95 SPONSORSHIP AWARD: An engineering network to address challenges in microreactor processing for scale up of nano-material synthesis EPSRC £50,242 July 30, 2014 Sept. 29, 2015 Closed 96 Understanding Membranes for Redox Flow Batteries EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 97 Understanding Membranes for Redox Flow Batteries EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 98 SCORE: Supply Chain Optimisation for demand Response Efficiency ISCF £2,539,137 June 30, 2021 June 30, 2023 Closed 99 A GLOBAL FRAMEWORK FOR QUANTIFYING THE ECOSYSTEM SERVICE IMPACTS OF OIL AND BIOFUEL PRODUCTION NERC £419,484 Nov. 1, 2011 Oct. 31, 2013 Closed 100 A GLOBAL FRAMEWORK FOR QUANTIFYING THE ECOSYSTEM SERVICE IMPACTS OF OIL AND BIOFUEL PRODUCTION NERC £1,048,710 Nov. 1, 2011 Oct. 31, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »