More like:
DRES [Clear]

# Title Funder Funding Start End Status
1 Nash equilibria for load balancing in networked power systems EPSRC
£994,762
March 31, 2016 May 10, 2019 Closed
2 Nash equilibria for load balancing in networked power systems EPSRC
£2,486,905
March 31, 2016 May 11, 2019 Closed
3 Advanced Dynamic Energy Pricing and Tariffs (ADEPT) EPSRC
£1,390,942
Sept. 30, 2010 Dec. 30, 2013 Closed
4 Advanced Dynamic Energy Pricing and Tariffs (ADEPT) EPSRC
£607,794
March 17, 2011 March 16, 2014 Closed
5 Advanced Dynamic Energy Pricing and Tariffs (ADEPT) EPSRC
£3,477,355
Sept. 30, 2010 Dec. 30, 2013 Closed
6 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC
£2,594,834
Sept. 30, 2020 Sept. 29, 2024 Active
7 Heat Pump Fully Integrated with Thermochemical Store (HP-FITS) EPSRC
£6,487,085
Sept. 30, 2020 Sept. 30, 2024 Active
8 Integrated, Market-fit and Affordable Grid-scale Energy Storage (IMAGES) EPSRC
£6,038,140
Aug. 31, 2012 June 29, 2018 Closed
9 Integrated, Market-fit and Affordable Grid-scale Energy Storage (IMAGES) EPSRC
£15,095,350
Aug. 31, 2012 June 30, 2018 Closed
10 Energy Management in Botswana and Sub Saharan Africa (EMBOSSA) EPSRC
£202,412
April 30, 2017 March 30, 2018 Closed
11 Energy Management in Botswana and Sub Saharan Africa (EMBOSSA) EPSRC
£506,030
April 30, 2017 March 31, 2018 Closed
12 Negotiating thermal comfort in the provision of smart heating EPSRC
£0
Sept. 22, 2019 Sept. 14, 2023 Active
13 Electric Fleets with On-site Renewable Energy Sources (EFORES): Data-driven Dynamic Dispatching and Charging under Uncertainties EPSRC
£100,764
Dec. 1, 2021 Jan. 31, 2023 Active
14 Electric Fleets with On-site Renewable Energy Sources (EFORES): Data-driven Dynamic Dispatching and Charging under Uncertainties EPSRC
£251,910
Feb. 1, 2022 Jan. 31, 2023 Closed
15 Faster model fitting for quantile additive models EPSRC
£0
Sept. 30, 2021 Sept. 18, 2025 Active
16 Faster model fitting for quantile additive models EPSRC
£0
Sept. 30, 2021 Sept. 19, 2025 Active
17 DD-DSM: Demonstration of Distributed Demand-side Management as a service to the UK grid operator EPSRC
£444,554
Jan. 1, 2009 Dec. 31, 2010 Closed
18 DD-DSM: Demonstration of Distributed Demand-side Management as a service to the UK grid operator EPSRC
£1,111,385
Jan. 1, 2009 Dec. 31, 2010 Closed
19 Building as a Power Plant: The use of buildings to provide demand response EPSRC
£334,176
July 31, 2017 March 31, 2019 Closed
20 Building as a Power Plant: The use of buildings to provide demand response EPSRC
£835,440
July 31, 2017 March 31, 2019 Closed
Reset