# Title Funder Funding Start End Status
21 Addressing the complexity of future power system dynamic behaviour FLF
£2,977,695
March 31, 2024 March 31, 2027 Active
22 Maximising and measuring impact from the RATE programme NERC
£279,210
Nov. 1, 2018 Sept. 29, 2021 Closed
23 Impact of Grid Forming Converters on Power System Stability EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
24 Impact of Grid Forming Converters on Power System Stability EPSRC
£0
Sept. 30, 2020 March 31, 2024 Active
25 Real-time Virtual Prototypes for the Power Electronics Supply Chain EPSRC
£5,182,945
June 30, 2023 June 30, 2026 Active
26 Multi-sectoral interactions in global energy end-use EPSRC
£1,157,400
Jan. 1, 2013 Dec. 31, 2015 Closed
27 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC
£1,341,844
March 1, 2013 Feb. 29, 2016 Closed
28 Developing Scalable Smart Grid Infrastructure to Enable Secure Transmission System Control EPSRC
£3,354,610
March 1, 2013 Feb. 29, 2016 Closed
29 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC
£1,043,994
Aug. 31, 2008 Feb. 29, 2012 Closed
30 Multi-terminal dc transmission micro-grid system for interfacing multiple wind turbines EPSRC
£2,609,985
Aug. 31, 2008 Feb. 29, 2012 Closed
31 Smart Integration of Waste and Renewable Energy for Sustainable Heat Upgrade in the Industry Horizon Europe Guarantee
£1,341,720
April 30, 2023 April 30, 2027 Active
32 IPS Fellowship Extension STFC
£37,392
March 16, 2019 March 15, 2021 Closed
33 IPS Fellowship Extension STFC
£93,480
March 16, 2019 March 15, 2021 Closed
34 i-PREDICT: Integrated adaPtive pRocEss DesIgn and ConTrol EPSRC
£423,322
Nov. 1, 2022 Oct. 31, 2025 Active
35 Future Millimetre Wave RF Transceiver Architectures for Communications Systems UKRI
£2,358,106
Jan. 25, 2021 Jan. 24, 2025 Active
36 Future Millimetre Wave RF Transceiver Architectures for Communications Systems FLF
£5,895,265
Jan. 25, 2021 Jan. 24, 2025 Active
37 Flexibility services based on Connected and interoperable Hybrid Energy Storage System Horizon Europe Guarantee
£1,428,225
Dec. 1, 2022 Nov. 30, 2025 Active
38 Flexibility services based on Connected and interoperable Hybrid Energy Storage System Horizon Europe Guarantee
£1,293,750
Dec. 1, 2022 Nov. 30, 2025 Active
39 Digital twins for improved dynamic design EPSRC
£10,225,248
Feb. 1, 2018 June 29, 2023 Active
40 Digital twins for improved dynamic design EPSRC
£25,563,120
Feb. 1, 2018 Sept. 30, 2023 Closed
Reset