Home Projects More like: The Synthesis of Mathematical and Data Driven Modelling of Complex Physical Systems [Clear] # Title Funder Funding Start End Status 61 Modelling the human occupancy factor in the design of naturally ventilated buildings EPSRC £1,101,870 Jan. 1, 2006 Nov. 30, 2008 Closed 62 Mathematical tools for improving the understanding of uncertainty in offshore turbine operation and maintenance EPSRC £488,410 March 31, 2011 March 30, 2014 Closed 63 Mathematical tools for improving the understanding of uncertainty in offshore turbine operation and maintenance EPSRC £1,221,025 March 31, 2011 March 31, 2014 Closed 64 Indo - UK: Premature, Oscillation-Induced Critical Heat Flux ("Premature OICHF") EPSRC £563,645 Dec. 1, 2015 Nov. 30, 2018 Closed 65 Fatigue and damage tolerance of 3D-woven composites EPSRC £0 Sept. 30, 2021 Sept. 30, 2025 Active 66 TReal World Solar Power Prediction and Use Optimisation EPSRC £0 Sept. 30, 2019 Sept. 18, 2025 Active 67 TReal World Solar Power Prediction and Use Optimisation EPSRC £0 Sept. 30, 2019 Sept. 19, 2025 Active 68 Net Zero Carbon Decision Intelligence Planning Capability Innovate UK £47,328 Nov. 1, 2022 April 29, 2023 Active 69 Impact-based forecasting for the renewable energy sector EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 70 Impact-based forecasting for the renewable energy sector EPSRC £0 Sept. 30, 2021 Oct. 31, 2025 Active 71 Biotelemetry/Bio-aerial-platforms for the Urban Boundary Layer NERC £3,305,925 Jan. 4, 2016 March 31, 2020 Closed 72 UKAEA / EPSRC Fusion Grant 2022/27 EPSRC £14,000,000 March 31, 2022 March 30, 2023 Active 73 UKAEA / EPSRC Fusion Grant 2022/27 EPSRC £387,000,000 March 31, 2022 March 31, 2027 Active 74 Data-Driven Power System Operation EPSRC £0 Jan. 1, 2017 June 30, 2020 Closed 75 SOURCE: Improved insitu Stiffness measurements for Offshore foundation design considering Uncertainty, Repeatability and Common sources of Error EPSRC £414,092 Nov. 1, 2022 Oct. 31, 2024 Active 76 SOURCE: Improved insitu Stiffness measurements for Offshore foundation design considering Uncertainty, Repeatability and Common sources of Error EPSRC £2,070,460 Nov. 1, 2022 Oct. 31, 2024 Active 77 Artificial Intelligence for Optimisation and Demand Side Response of Built Environment Management EPSRC £0 Sept. 30, 2017 Sept. 30, 2020 Closed 78 UK Battery Research and Development Centre Feasibility Study Innovate UK £323,466 Nov. 1, 2020 March 30, 2021 Closed 79 EPSRC Project Summary: New Methods for Network Time Series Analysis EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 80 Enabling CO2 capture and storage using AI EPSRC £8,952,890 April 30, 2023 March 31, 2025 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »