Home Projects More like: Simulations tools to enable Asset Life Extension (SALE) [Clear] # Title Funder Funding Start End Status 41 Active wind farm control via morphing blade technology EPSRC £0 Sept. 30, 2022 Sept. 30, 2025 Active 42 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience UKRI £2,755,446 Feb. 1, 2022 Jan. 31, 2026 Active 43 Extremes, Performance and Longevity for Offshore Renewable Energy Resilience FLF £6,888,615 Feb. 1, 2022 Jan. 31, 2026 Active 44 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £1,589,160 Sept. 30, 2021 Sept. 29, 2024 Active 45 Severe Storm Wave Loads on Offshore Wind Turbine Foundations (SEA-SWALLOWS) EPSRC £3,972,900 Sept. 30, 2021 Sept. 30, 2024 Active 46 PREDICTOR: Improving the energy performance of closed-loop heating and cooling systems. EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 47 PREDICTOR: Improving the energy performance of closed-loop heating and cooling systems. EPSRC £0 Sept. 30, 2020 March 31, 2024 Active 48 API Engineering technical feasibility study for a direct drive small wind turbine with an integrated induction generator & power converter for a 'plug and play' approach Innovate UK £200,000 Sept. 30, 2011 March 31, 2013 Closed 49 Identification methods for offshore wind turbine structures and foundations EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 50 Development and Evaluation of Sustainable Technologies for Flexible Operation of Conventional Power Plants. EPSRC £3,888,880 Sept. 15, 2013 March 14, 2019 Closed 51 Development and Evaluation of Sustainable Technologies for Flexible Operation of Conventional Power Plants. EPSRC £9,722,200 Sept. 15, 2013 March 14, 2019 Closed 52 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 29, 2024 Active 53 Remaining useful life and lifetime extension of wind turbine drivetrains EPSRC £0 April 30, 2020 April 30, 2024 Active 54 New Phase Field Models for Unravelling Multi-Physics Material Degradation Challenges (NEWPHASE) UKRI £1,473,300 Sept. 30, 2021 Sept. 29, 2025 Active 55 New Phase Field Models for Unravelling Multi-Physics Material Degradation Challenges (NEWPHASE) FLF £7,366,500 Sept. 30, 2021 Sept. 30, 2025 Active 56 Firedrake: high performance, high productivity simulation for the continuum mechanics community. EPSRC £688,848 Sept. 30, 2022 Sept. 29, 2025 Active 57 SWEPT2 EPSRC £179,650 April 30, 2015 April 29, 2018 Closed 58 SWEPT2 EPSRC £449,125 April 30, 2015 April 30, 2018 Closed 59 Developing better outputs from building thermal simulation tools to improve decision making in the design of low energy buildings EPSRC £198,246 Aug. 31, 2012 Nov. 30, 2013 Closed 60 Developing better outputs from building thermal simulation tools to improve decision making in the design of low energy buildings EPSRC £495,615 Aug. 31, 2012 Nov. 30, 2013 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »