Home Projects More like: Protocol for SI-traceable validation of methods for biomethane conformity assessment [Clear] # Title Funder Funding Start End Status 81 Gas Quality Fuel Cell Sensor Prototype Phase 1 Innovate UK £1,338,855 Sept. 30, 2020 Aug. 31, 2021 Closed 82 Carbon/biocomposite hybrid vehicle structures for reduced weight, cost and environmental impact (CARBIO) EPSRC £592,225 Jan. 14, 2014 Jan. 13, 2016 Closed 83 Next generation anion-exchange membranes (AEM) with covalently-bound antiradical functions for enhanced durability EPSRC £1,063,676 Sept. 23, 2020 March 23, 2024 Active 84 Next generation anion-exchange membranes (AEM) with covalently-bound antiradical functions for enhanced durability EPSRC £900,380 Sept. 30, 2020 March 31, 2024 Active 85 Transforming heat-recovery system performance by exploiting multi component turbine flows EPSRC £1,597,430 Dec. 1, 2014 Nov. 30, 2019 Closed 86 Transforming heat-recovery system performance by exploiting multi component turbine flows EPSRC £3,993,575 Dec. 1, 2014 Nov. 30, 2019 Closed 87 Recovery and re-use of energy, water and nutrients from waste in the food chain (Redivivus) EPSRC £745,146 Dec. 31, 2014 Dec. 31, 2018 Closed 88 Recovery and re-use of energy, water and nutrients from waste in the food chain (Redivivus) EPSRC £1,862,865 Dec. 31, 2014 Dec. 31, 2018 Closed 89 Dynamic Organic Rankine Cycle for Recovering Industrial Waste Heat EPSRC £196,960 Feb. 7, 2016 April 29, 2017 Closed 90 Dynamic Organic Rankine Cycle for Recovering Industrial Waste Heat EPSRC £492,400 Feb. 7, 2016 April 30, 2017 Closed 91 Unmanned Surface Vessels for Rapid Environmental Assessment in challenging inland waterways and tidal environments ISCF £3,318,135 Feb. 1, 2019 April 30, 2021 Closed 92 Smart-GeoWells: Smart technologies for optimal design, drilling, completion and management of geothermal wells EPSRC £981,772 April 30, 2017 April 29, 2019 Closed 93 North Sea Interactive: A decision-support tool to guide environmental monitoring by the oil and gas industry NERC £26,450 Jan. 14, 2014 Oct. 31, 2014 Closed 94 North Sea Interactive: A decision-support tool to guide environmental monitoring by the oil and gas industry NERC £66,125 Jan. 14, 2014 Oct. 31, 2014 Closed 95 Water Engineering: Membrane fouling for low energy advanced wastewater treatment EPSRC £196,454 Jan. 21, 2013 Jan. 20, 2014 Closed 96 Water Engineering: Membrane fouling for low energy advanced wastewater treatment EPSRC £491,135 Jan. 21, 2013 Jan. 20, 2014 Closed 97 INTEGRATED ASSESSMENT OF QUALITY OF SUPPLY IN FUTURE ELECTRICITY NETWORKS EPSRC £1,682,580 March 1, 2010 Aug. 31, 2013 Closed 98 Center for Low Emission Vehicle Research (CLEVeR) EPSRC £358,470 Jan. 2, 2014 Jan. 1, 2017 Closed 99 Center for Low Emission Vehicle Research (CLEVeR) EPSRC £896,175 Jan. 2, 2014 Jan. 1, 2017 Closed 100 IMPULSE - Advanced Industrial Manufacture of Next-Generation MARBN Steel for Cleaner Fossil Plant Innovate UK £1,275,538 April 30, 2016 April 29, 2019 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »