Home Projects More like: Green Hydrogen production storage and use. [Clear] # Title Funder Funding Start End Status 41 The role of green hydrogen in the West Midlands Combined Authority local energy system EPSRC £0 Sept. 30, 2021 Sept. 29, 2025 Active 42 Electrochemical conversion of nitrogen to ammonia-experimental and theoretical studies Innovate UK £374,150 March 1, 2016 May 31, 2017 Closed 43 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £706,292 Dec. 8, 2014 Dec. 7, 2017 Closed 44 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC £602,472 Dec. 31, 2014 June 29, 2018 Closed 45 NextGen Fuel-Cell Electric Buses to Accelerate a Low-Carbon Hydrogen Economy (NextGenFCEV) Innovate UK £11,116,422 May 31, 2021 Nov. 30, 2024 Active 46 NextGen Fuel-Cell Electric Buses to Accelerate a Low-Carbon Hydrogen Economy (NextGenFCEV) Innovate UK £27,790,150 May 31, 2021 Nov. 30, 2024 Active 47 Electrolysis at scale: a pathway to lower precious metal content electrolysers EPSRC £391,366 Jan. 1, 2023 Dec. 31, 2025 Active 48 Pilot scale PCBFC manufacturing Innovate UK £1,817,516 Aug. 31, 2022 Feb. 29, 2024 Active 49 Marine Small-ship Zero-carbon H2 Demonstrator with Innovative Port-manoeuvring Innovate UK £828,509 Aug. 31, 2021 March 30, 2022 Active 50 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC £240,882 Oct. 16, 2022 Oct. 15, 2023 Active 51 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC £1,204,410 Oct. 16, 2022 Nov. 16, 2023 Closed 52 Anion exchange membrane water electrolysis for low-cost green hydrogen production (AEM-H2) EPSRC £249,433 Aug. 31, 2022 Aug. 30, 2023 Active 53 Mayflower - The Feasibility Study Innovate UK £140,389 Aug. 31, 2021 March 30, 2022 Closed 54 Analysis of Catrode process for mass production of catalysts Innovate UK £16,140 Jan. 1, 2023 March 30, 2023 Active 55 Sustainable Hydrogen Production from Seawater Electrolysis EPSRC £252,889 Sept. 30, 2022 Sept. 29, 2024 Active 56 Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage BBSRC £196,818 Jan. 1, 2016 Dec. 31, 2016 Closed 57 Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage BBSRC £492,045 Jan. 1, 2016 Dec. 31, 2016 Closed 58 Closed Loop Carbon Cycle for food energy fuel waste and water Innovate UK £99,400 Feb. 1, 2013 May 30, 2013 Closed 59 Closed Loop Carbon Cycle for food energy fuel waste and water Innovate UK £248,500 Feb. 1, 2013 May 31, 2013 Closed 60 Supported MoTe2: proving the viability of a 2D material to be employed in the PEM flow cell for the hydrogen production EPSRC £246,774 Sept. 30, 2022 March 31, 2024 Active Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »