# Title Funder Funding Start End Status
41 The role of green hydrogen in the West Midlands Combined Authority local energy system EPSRC
£0
Sept. 30, 2021 Sept. 29, 2025 Active
42 Electrochemical conversion of nitrogen to ammonia-experimental and theoretical studies Innovate UK
£374,150
March 1, 2016 May 31, 2017 Closed
43 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£706,292
Dec. 8, 2014 Dec. 7, 2017 Closed
44 Temperature and Alkali Stable Polymer Electrolytes for Hydrogen and Carbon Dioxide Alkaline Electrolysers EPSRC
£602,472
Dec. 31, 2014 June 29, 2018 Closed
45 NextGen Fuel-Cell Electric Buses to Accelerate a Low-Carbon Hydrogen Economy (NextGenFCEV) Innovate UK
£11,116,422
May 31, 2021 Nov. 30, 2024 Active
46 NextGen Fuel-Cell Electric Buses to Accelerate a Low-Carbon Hydrogen Economy (NextGenFCEV) Innovate UK
£27,790,150
May 31, 2021 Nov. 30, 2024 Active
47 Electrolysis at scale: a pathway to lower precious metal content electrolysers EPSRC
£391,366
Jan. 1, 2023 Dec. 31, 2025 Active
48 Pilot scale PCBFC manufacturing Innovate UK
£1,817,516
Aug. 31, 2022 Feb. 29, 2024 Active
49 Marine Small-ship Zero-carbon H2 Demonstrator with Innovative Port-manoeuvring Innovate UK
£828,509
Aug. 31, 2021 March 30, 2022 Active
50 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC
£240,882
Oct. 16, 2022 Oct. 15, 2023 Active
51 Scalable metamaterial thermally sprayed catalyst coatings for nuclear reactor high temperature solid oxide steam electrolysis (METASIS) EPSRC
£1,204,410
Oct. 16, 2022 Nov. 16, 2023 Closed
52 Anion exchange membrane water electrolysis for low-cost green hydrogen production (AEM-H2) EPSRC
£249,433
Aug. 31, 2022 Aug. 30, 2023 Active
53 Mayflower - The Feasibility Study Innovate UK
£140,389
Aug. 31, 2021 March 30, 2022 Closed
54 Analysis of Catrode process for mass production of catalysts Innovate UK
£16,140
Jan. 1, 2023 March 30, 2023 Active
55 Sustainable Hydrogen Production from Seawater Electrolysis EPSRC
£252,889
Sept. 30, 2022 Sept. 29, 2024 Active
56 Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage BBSRC
£196,818
Jan. 1, 2016 Dec. 31, 2016 Closed
57 Oscillatory baffled reactor for enhanced 1C gas bioconversion for energy production and storage BBSRC
£492,045
Jan. 1, 2016 Dec. 31, 2016 Closed
58 Closed Loop Carbon Cycle for food energy fuel waste and water Innovate UK
£99,400
Feb. 1, 2013 May 30, 2013 Closed
59 Closed Loop Carbon Cycle for food energy fuel waste and water Innovate UK
£248,500
Feb. 1, 2013 May 31, 2013 Closed
60 Supported MoTe2: proving the viability of a 2D material to be employed in the PEM flow cell for the hydrogen production EPSRC
£246,774
Sept. 30, 2022 March 31, 2024 Active
Reset