Home Projects More like: VAWT [Clear] # Title Funder Funding Start End Status 1 The effect of purge-mainstream density ratio on turbine cavity flows. EPSRC £0 Sept. 30, 2021 March 30, 2025 Active 2 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £400,894 Oct. 2, 2016 Oct. 1, 2018 Closed 3 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC £1,002,235 Oct. 2, 2016 Oct. 2, 2018 Closed 4 the noise reduction of wind turbine blade noise emission EPSRC £0 Sept. 30, 2017 March 30, 2021 Closed 5 TEK4 - POWERJET - The first high precision waterjet drill that will revolutionise turbine blade manufacture. Innovate UK £296,096 Feb. 1, 2022 April 29, 2023 Active 6 Evaluating Novel Wind Energy Designs EPSRC £0 Sept. 23, 2018 March 30, 2022 Active 7 Evaluating Novel Wind Energy Designs EPSRC £0 Sept. 30, 2018 March 31, 2022 Closed 8 Modularised Platform Technology of Twin Axis PECM Machine Tool Innovate UK £50,000 July 31, 2014 Jan. 31, 2015 Closed 9 CFD investigations of turbine rim seal physics EPSRC £0 March 31, 2017 June 29, 2020 Closed 10 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC £0 Sept. 30, 2019 Sept. 29, 2023 Active 11 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC £0 Sept. 30, 2019 Sept. 30, 2023 Closed 12 WindSurf- Smart energy for the 21st century Innovate UK £843,910 Sept. 30, 2016 June 29, 2018 Closed 13 WindSurf- Smart energy for the 21st century Innovate UK £2,109,775 Sept. 30, 2016 June 30, 2018 Closed 14 Flexible Coupled Multi-Body Dynamic Research of Floating Offshore Wind Turbines EPSRC £0 Sept. 30, 2020 Sept. 29, 2024 Active 15 Flexible Coupled Multi-Body Dynamic Research of Floating Offshore Wind Turbines EPSRC £0 Sept. 30, 2020 Sept. 30, 2024 Active 16 Developing Offshore Floating Technology EPSRC £0 Aug. 31, 2022 Aug. 31, 2026 Active 17 Intelligent Blade Controlled Wind Turbine Innovate UK £419,206 Dec. 1, 2019 March 30, 2021 Closed 18 Intelligent Blade Controlled Wind Turbine Innovate UK £1,048,015 Dec. 1, 2019 March 31, 2021 Closed 19 Purchase of Six Component Wind Tunnel Balance EPSRC £1,509,988 June 30, 2018 Dec. 31, 2021 Closed 20 Purchase of Six Component Wind Tunnel Balance EPSRC £3,774,970 June 30, 2018 Dec. 31, 2021 Closed Reset Search Term(s): Status: --------- Closed Active Start Year(s): 1998 1999 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2026 End Year(s): 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Minimum Project Funding (£): Maximum Project Funding (£): Sort By: --------- Project Title Project Title (descending) Total Funding Total Funding (descending) Start Date Start Date (descending) End Date End Date (descending) « 1 2 3 4 5 »