More like:
VAWT [Clear]

# Title Funder Funding Start End Status
1 The effect of purge-mainstream density ratio on turbine cavity flows. EPSRC
£0
Sept. 30, 2021 March 30, 2025 Active
2 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC
£400,894
Oct. 2, 2016 Oct. 1, 2018 Closed
3 WindSurf- A self-starting, active-pitch, vertical-axis wind turbine EPSRC
£1,002,235
Oct. 2, 2016 Oct. 2, 2018 Closed
4 the noise reduction of wind turbine blade noise emission EPSRC
£0
Sept. 30, 2017 March 30, 2021 Closed
5 TEK4 - POWERJET - The first high precision waterjet drill that will revolutionise turbine blade manufacture. Innovate UK
£296,096
Feb. 1, 2022 April 29, 2023 Active
6 Evaluating Novel Wind Energy Designs EPSRC
£0
Sept. 23, 2018 March 30, 2022 Active
7 Evaluating Novel Wind Energy Designs EPSRC
£0
Sept. 30, 2018 March 31, 2022 Closed
8 Modularised Platform Technology of Twin Axis PECM Machine Tool Innovate UK
£50,000
July 31, 2014 Jan. 31, 2015 Closed
9 CFD investigations of turbine rim seal physics EPSRC
£0
March 31, 2017 June 29, 2020 Closed
10 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 29, 2023 Active
11 O&M Optimisation for the X-Rotor Wind Turbine Concept EPSRC
£0
Sept. 30, 2019 Sept. 30, 2023 Closed
12 WindSurf- Smart energy for the 21st century Innovate UK
£843,910
Sept. 30, 2016 June 29, 2018 Closed
13 WindSurf- Smart energy for the 21st century Innovate UK
£2,109,775
Sept. 30, 2016 June 30, 2018 Closed
14 Flexible Coupled Multi-Body Dynamic Research of Floating Offshore Wind Turbines EPSRC
£0
Sept. 30, 2020 Sept. 29, 2024 Active
15 Flexible Coupled Multi-Body Dynamic Research of Floating Offshore Wind Turbines EPSRC
£0
Sept. 30, 2020 Sept. 30, 2024 Active
16 Developing Offshore Floating Technology EPSRC
£0
Aug. 31, 2022 Aug. 31, 2026 Active
17 Intelligent Blade Controlled Wind Turbine Innovate UK
£419,206
Dec. 1, 2019 March 30, 2021 Closed
18 Intelligent Blade Controlled Wind Turbine Innovate UK
£1,048,015
Dec. 1, 2019 March 31, 2021 Closed
19 Purchase of Six Component Wind Tunnel Balance EPSRC
£1,509,988
June 30, 2018 Dec. 31, 2021 Closed
20 Purchase of Six Component Wind Tunnel Balance EPSRC
£3,774,970
June 30, 2018 Dec. 31, 2021 Closed
Reset